1 / 10

CURRENT PORT OPENING COMPANY DESIGN

CURRENT PORT OPENING COMPANY DESIGN. PORT OPENING COMPANY. MISSION: PROVIDE SPECIALIZED ENGR SUPPORT IN OPENING, REHABILITATING, MAINTAINING PORT FACILITIES, TO INCLUDE LOTS OPS. ASSIGNMENT: TO A SENIOR ENGR HQ (GROUP OR HHD ENGR TEAM). ATTACHED TO TRANSPORTATION

khanh
Download Presentation

CURRENT PORT OPENING COMPANY DESIGN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CURRENT PORT OPENING COMPANY DESIGN

  2. PORT OPENING COMPANY MISSION: PROVIDE SPECIALIZED ENGR SUPPORT IN OPENING, REHABILITATING, MAINTAINING PORT FACILITIES, TO INCLUDE LOTS OPS. ASSIGNMENT: TO A SENIOR ENGR HQ (GROUP OR HHD ENGR TEAM). ATTACHED TO TRANSPORTATION TERMINAL BN. EMPLOYMENT: AUGMENTS A CMBT HVY BN WITH SPECIALIZED EQUIPMENT. ONE OR MORE CONSTRUCTION PLT MAY DEPLOY INDEPENDENTLY.

  3. Organization 8/2/187 Port Opening 1 •• 1/0/10 •• 3/0/10 •• 0/1/5 1/0/38 ••• 2 3 CP HQ OPS Supply ••• 1/1/38

  4. CAPABILITIES • • SPECIALIZED PERSONNEL & EQUIPMENT FOR CONSTRUCTION OF: • - LOTS OPERATIONS • - OFF SHORE FACILITIES SUCH AS: • - MOORING SYSTEM - JETTIES, - BREAKWATERS - PIERS • - WHARFS - OTHER CARGO HANDLING STR • - FACILITIES FOR ROLL ON, ROLL OF BREAK BULK AND CONTAINERIZED CARGO HANDLING. • - TANKER DISCHARGE FACILITIES (POL JETTIES, SUBMARINE PIPELINE). • LIMITED DREDGING AND REMOVAL OF UNDER WATER OBSTRUCTIONS. • • INSTAL OFF-SHORE PETROLEUM DISCHARGE SYSTEM WHERE NO NAVAL UNITS ASSIGNED.

  5. DEPENDS ON: • HVY DIVING TEAM FOR UNDER WATER CONSTRUCTION, • SURVEY, RECON, AND RECOVERY. • CMBT HVY BN FOR ADDITIONAL PERSONNEL AND EQUIPMENT • SUPPORT IN REHAB AND CONSTRUCTION OR PORT. • TRANSPORTATION UNITS FOR BARGE TYPE PIERS, ELEVATED • CAUSEWAYS AND FLOATING CRAFT.

  6. BACKUP SLIDES

  7. ARTEP TASK LIST • PILE DRIVING • PIER AND RAMP CONSTRUCTION • PIER REHABILITATION • WOODEN DOLPHIN CONSTRUCTION • UNDER WATER EXCAVATION • LANDING CRAFT RAMPS • UNDER WATER PIPELINE INSTALLATION • MOORING PILES INSTALLATION • CONVENTIONAL UNDER WATER ANCHOR SYSTEM • INSTALLATION • HARBOR CRAFT REPAIR AND REFUELING FACILITIES • CONSTRUCTION • ROCK CRIB CONSTRUCTION

  8. SUMMARY OF COMPANY TRAINING/MISSION (LAST 5 YEARS) • 801ST (MARE ISLAND, CA) • OVERLAND PILE DRIVING AND PIER CONSTRUCTION • CONCRETE, MASONRY, ROUGH AND FINISH CARPENTRY, AND ELECTRICAL • CONSTRUCTION • 2 YEARS AGO THE UNIT REBUILT A FINGER PIER AND DROVE 200 PILES • 3 & 4 YEARS AGO THE UNIT DEPLOYED TO THE MARSHALL ISLANDS TO DRIVE • SHEET PILE AND PERFORM TYPHOON REHABILITATION • THE UNIT HAS A COMPLETELY EQUIPPED AND TRAINED SURVEYOR SECTION • THIS UNIT HAS PIPELINE-LAYING EQUIPMENT BUT NO ONE IS TRAINED ON THE • EQUIPMENT • THE COMPANY MOVED TO ITS CURRENT LOCATION 2 YEARS AGO AND IS STILL • GOING THROUGH THE TRANSITION AND MOVING PROCESS • 699TH (CEIBA, PUERTO RICO) • PIER AND RAMP CONSTRUCTION IN FLORIDA • PIER REHABILITATION IN PUERTO RICO AND THE US VIRGIN ISLANDS FOR • HURRICANE RELIEF EFFORTS • ANNUAL PILE DRIVING IN THE LOCAL AREA • WOODEN DOLPHIN CONSTRUCTION • CARPENTRY, MASONRY, AND BULLDOZER WORK IN GUATEMALA FOR THE NEW • HORIZONS TRAINING EXERCISE

  9. Concerns • Dive detachment • 88K & 88L • Vibratory Hammer • Impact Hammers that work • Corrosion of equipment

  10. Concerns • Asphalt/Concrete operator MOS, but no asphalt equipment • Transportation of pontoons sections • Outdated 40T cranes and parts • Hauling assets (Lowboys)

More Related