An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the n-TOF experiment E.Chiaveri(EN-STI-EET) n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  2. ITEMS n_TOF Collaboration Meeting Sevilla 15/17 December 2010 • n_TOF Facility Status • Borated Water Moderator system • Beam Alignment • Ventilation System • Integrated protons 2010 • n_TOF-Ph2 experimental campaign 2011 • ERINDA Program • Summary

  3. Entrance of n_TOF beam line n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  4. Entrance to the n_TOF beam line n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  5. Material entrance Changing room n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  6. n_TOF changing room n_TOF Changing room n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  7. Escape line n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  8. n_TOF Experimental Area n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  9. Cooling and moderator station • The target and moderator circuits are decoupled and work independently Moderator system Target cooling system n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  10. n_TOF borated water moderator circuit • The n_TOF borated water circuit is the result of a strong collaboration between different CERN groups: EN/STI, EN/CV, EN/MME and TE/VSC • Main goal: improvements of g background conditions in the 200 m experimental area due to a decrease in the production of thermal neutrons capture in 1H • a great improvement for neutron-induced capture reactions with the C6D6 liquid scintillator! • It is the first time that a borated water moderator is operated in saturated conditions (1.28% in H3BO3)  initial unknown parameters in the operation! n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  11. n_TOF borated water moderator circuit • October 2009: design specifications set • critical points: choice of materials and the technical implementation of the solution envisaged to keep the boric acid concentration in a stable condition • April 2010: the system has been installed, connected with the cooling circuit and tested successfully with light water. • May 2010: the system was tested successfully with beam • May-June 2010: commissioning of the new beam line and of the moderator circuit: • reduction of thermal peak as expected from simulations • observation of the expected reduction in the background due to delayed g-rays reaching the EAR together with ~keV neutrons Complex work realized in only 6 months! n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  12. n_TOF borated water moderator circuit • Chemical stability is an asset for the safe operation of the cooling and moderator circuit • An increase of the water conductivity was observed during operation • regular water samples analysis showed no worries for corrosion, since conductivity was due to the presence of non-reacting sodium • Sodium was originating from the non optimized cationic resin used to filter activation products • A test bench will be realized at CERN in November 2010 in view of the 2011 n_TOF run • 2011 n_TOF run will operate with an optimized resin and looks forward to a successful run n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  13. The neutron fluence with normal and borated water (100 bpd) x18 x13 x1.6 x1.2 *Flux from PTB chamber, to be combined with MGAS, SiMon and simulations (FLUKA and MCNP). n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  14. n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  15. Test bench for n_TOF resins (moderator circuit) • 2010 run showed an unexpected increase of conductivity in the moderator circuit, mainly due to the release of Na from the non-specialized resins (Amberlite 200C Na – cationic only) • A test bench was setup from 22nd November 2010 @CERN to study the effectiveness of a nuclear-grade mixed bed resin (IRN 9882LN) foreseen for 2011 operation • Objectives: • follow the evolution of the conductivity as function of time (wash-out of resins) • quantify the boric acid retention by the mixed bed before reaching equilibrium • Preliminary results: • Conductivity evolution present but much lower (as expected, 4x reduction wrt cationic, after recirculation in resin) • H3BO3 retention: ~150 g/l  ~4 kg needed for saturation vessel Al vessel resin Recirculation pump L. Ferreira, R. Mollay + EN/STI n_TOF Collaboration Meeting Sevilla 15/17 December 2010 MC

  16. Alignment campaign 2010 • Surveyor’s theoretical beam line defined with the following steps: • A theodolite is placed in the Escape Lane (FIC2 place), where fixed (2001) reference points are placed in the floor • Theodolite view is set to 0.67°proper inclination of the TOF line. For the radial direction, uses a reference in the EL • Observation: The center of the theodolite is very close to the mechanical center of the neutron window • Vertical ok • Horizontal is shifted by ~1 cm n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  17. Alignment campaign 2010 • The 1st collimator is shifted up by 1.9 cm, left by 0.75 cm, looking to the target • No information on the possible tilt • Explains the 2009 movements on the 2nd collimator • ~9% decrease in fluence from the simulations • Movement possible but not easy (not foreseen for now) • NB: this shift was always in place, since the construction of the facility! • 2010 Alignment will be performed by looking: • Vertically mechanical center of the window • Radially  5 cm to the leftof the mechanical center • New reference points will be established in the EAR-WS n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  18. Plans for 2010 concerning alignment • First measurements will include the movement of the 2nd collimatorto try maximizing the fluence • vertical movement only • horizontal will be available but too risky for the moment (possible if beam profile will show a significant horizontal skew) • SiMon + XYMG with 10B or 235U sample • simultaneous profile and fluence variation evaluation • borated water (*) • 235U will allow to have a reasonable statistics in the HE part • XYMG current routine (v. 2.8) limited by a significant dead-time (signal is ~200 ms long) X-Y MicroMegas Silicon Monitor Monitoring MGAS n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  19. Alignment Summary • n_TOF beam line up to the Experimental Area is aligned by looking at the spallation target neutron window • 2nd collimator is aligned accordingly • 1st collimator is shifted/tilted, no easy way to move it back to proper position  its effect on the flux reduction account to few % • Good agreement with simulated beam profile • Indications on the misalignment of the 2nd collimator • Predictions have been verified experimentally  could be used for alignment purposes n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  20. Ventilation system • By request of RP, the target area is continuously flushed out and air is released in the atmosphere on top of a building in ISR area: • Filter: 7Be, not efficient for noble gases • Flush: ~500 m3/h (after sealing of the primary area –40 Pa according to ISO 17873) • Volume: 1200 m3 • Dose to public: < 1mSv (!!) for 1.6*1019 p • assumed 41Ar (75%), 11C, 13N release n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  21. Releases from n_TOF during the 2009 run • In correspondence of each degassing operation, large short-lived radioactive release from the ventilation stack  triggers alarms within CERN perimeter Before intervention After intervention O2 limit – 0.08 mg/l 0.2 mg/l x 20 reduction! “baseline” due to target area activation + on top degassing releases (up to 1.5 GBq) … almost only target area activation n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  22. n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  23. Beam sharing in 2010 • Total beam intensity: 24% higher than initially scheduled • Beam usage efficiency for physics: ~85% n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  24. Parallel Plate Avalanche Chamber (PPAC) Detector into n_TOF Experimental Area • The installation of PPAC has been successfully done in five days taking into account • transport, vacuum, alignment, gas connection. • This time should be considered for the future planning. n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  25. n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  26. Parallel Plate Avalanche Chamber (PPAC) Detector n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  27. Parallel Plate Avalanche Chamber (PPAC) Detector into n_TOF Experimental Area n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  28. n_TOF-Ph2 experimental campaign 2011 n_TOF Collaboration Meeting Sevilla 15/17 December 2010 • After negotiation with the top management the Research Board accept to start nTOF run in March concurrently with the CNGS extension instead of May!! •   It was agreed that during this period the proton delivery to n-ToF should be based on around 6 cycles per supercycle. •  Once the other facilities are started up the delivery of dedicated cycles to n-ToF can then be reduced (from 4 to 3 daytime) in order to increase the duty cycle to Isolde. •   By this means it should be possible to achieve 1.6x10+19 pot for n-ToF.

  29. Status of proposed experiments Approved by INTC New *To be studied in more detail + Possibility of measuring in parallel with 240,242Pu(n,f) n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  30. ERINDAEuropean Research Infrastructuresfor Nuclear Data Applications • Objective: • contribute significantly to the future nuclear data needs for • radioactive waste management and innovative GenIV nuclear reactor systems • create access and beam-time for nuclear data measurements at EU facilities • direct this beam-time towards requests of highest priority and scientific value n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  31. ERINDA draft proposal EFNUDAT partners CNRS/IN2P3 (Bordeaux and Orsay, France) JRC-IRMM (Geel, Belgium) IKI (Budapest, Hungary) FZD (Dresden, Germany) PTB (Braunschweig, Germany) UU-TSL (Uppsala, Sweden) CEA (Bruyères-le-Châtel, France) n_TOF (Genève, Switzerland) NPI (Rez, Czech Republic) new partners NPL (Teddington, UK) IFIN-HH (Bucharest, Romania) JYU (Jyväskylä, Finland) JSI (Ljubljana, Slovenia) TSCS Charles Univ. (Rez, Czech Republic) potential (future) partners NFS (Caen, France) FRANZ (Frankfurt, Germany) n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  32. n_TOF Collaboration Meeting Sevilla 15/17 December 2010

  33. n_TOF Experiment Summary • Work Sector Type A experimental area • Converted the actual experimental area to a Work Sector Type A  no major restrictions on radioactive samples measurement • Significant improvement in measurement capabilities • 2. Operation of a borated water moderation system • 3. Disposal of the old Target and Radioactive Sources • Old Radioactive Sources delivered to ( National Technical University of Athens • IRMM-Geel, Forschungszentrum Dresden-Rossendorf (FZD)) • Disposal of Old target and remaining Sources under discussion with PSI • 4. 2009/2010 experimental campaign : • Most of the program completed and analysis ongoing • 5. 20011/2015 perspectives: • New institutes involved in the MoU (Mancheter, York,OakRidge,Thessaloniki ….) • 14 PhD at present n_TOF Collaboration Meeting Sevilla 15/17 December 2010