1 / 40

Bio-methane for Grid injection ( BfG ) supply chain workshop Welcome

Bio-methane for Grid injection ( BfG ) supply chain workshop Welcome. Bio-methane for Grid injection ( BfG ) supply chain workshop …. Agenda Welcome, introductions & RESCO update ‘The energy view’ – Iain Ward, cng services ltd ‘The technology view’ – Rob Hill, RESCO Break

Download Presentation

Bio-methane for Grid injection ( BfG ) supply chain workshop Welcome

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bio-methane for Grid injection (BfG) supply chain workshop Welcome

  2. Bio-methane for Grid injection (BfG) supply chain workshop … • Agenda • Welcome, introductions & RESCO update • ‘The energy view’ – Iain Ward, cng services ltd • ‘The technology view’ – Rob Hill, RESCOBreak • Review of UK activity and case studies – • Alan Midwinter, Scotia Gas Networks • Q&A and discussion • Lunch and networking BfGworkshop Sept 2011

  3. Bio-methane for Grid injection (BfG) supply chain workshop • Agenda • Welcome, introductions & RESCO update BfGworkshop Sept 2011

  4. The RESCO Programme Overall aim… • provide businesses in the West Midlands with the support they need to enter or expand into the supply chain markets of low carbon and renewable energy technologies. BfGworkshop Sept 2011

  5. The RESCO Programme Background and rationale • Build on the existing manufacturing and engineering skills in the Region. • UK renewable energy market - £31.1 billion (2007/8). Projected growth: 7.61% in 2011/2 (Innovas, 2009) • UK national target for renewable energy - 15% by 2020 • Funded by Advantage West Midlands • Duration: October 2009 – March 2012 • Managed by the Institute for Environment, Sustainability and Regeneration (IESR), Staffordshire University BfGworkshop Sept 2011

  6. The RESCO Programme Technology areas • Wind and Marine Power • Round 3 offshore wind development + STW, 1&2 extensions  47GW by 2020 (The Crown Estate, 2010) (~9400 offshore wind turbines) • Components, logistics, O&M and professional services • Bioenergy • Biofuels: Bio-crops, waste wood, biowaste • Anaerobic Digestion, pyrolysis • Waste separation and transport, plant operation, component manufacture, planning, legal service, training etc. BfGworkshop Sept 2011

  7. The RESCO Programme Technology areas • Small Scale Renewables • Solar thermal, PV, GSHP and ASHP, small scale wind and hydro, micro CHP. • Manufacture, installation, planning, consultancy, modelling • Power Generation and Transmission • Grid Connection – Large and Small Scale • Efficient Energy Transmission Technology • Energy Conversion and Storage • Key Markets  Component Supply, Technical Innovation BfGworkshop Sept 2011

  8. The RESCO Programme Client Engagement Structure One to one support BfGworkshop Sept 2011

  9. The RESCO Programme Client Engagement Process Website Registration Wind and Marine Bioenergy SCOPING VISIT Small scale renewables Approval Power Generation and Transmission Diagnostic Request Capability assessment On-care support/ graduate placement Special Interest groups BfGworkshop Sept 2011

  10. The RESCO Programme Ongoing and upcoming activities… SIGs: Other: • Birmingham Energy Savers (Phase 2) involvement • ERDF application to prolong and expand project • Regional mapping of renewable energy supply chain capabilities • New events programme starting in September, 2011 BfGworkshop Sept 2011

  11. Iain Wardcng services ltd The Energy View

  12. Bio-methane for grid injection supply chain workshop ‘The technology view’Rob Hill, RESCO BfGworkshop Sept 2011

  13. Overview • Technologies • Services • Feedstock • Future of biogas in the UK and EU BfGworkshop Sept 2011

  14. 1. Technologies Source: AD Strategy 2011

  15. Flare Gas Storage CHP Waste Reception Electrical Power Bio-filter Aerobic Stabilisation Thermal Power Shredder Buffer Screen Dewatering Dryer Oversize Metals Plastics Wood Digestate Shredder Water Treatment Digestor Hydrolysis Lights Pulper Heavies Mixed Non Organics & Organics Non Organics Water Organics CHP Hot Output CHP Cool Return Biogas Digestate AD Process Flow Source: Wardell Armstrong BfGworkshop Sept 2011

  16. Biogas produced from AD comprises several gases, predominantly CH4, CO2, H2S and NH4. • Before the biogas is suitable to be exported to the pipeline, it must undergo processing and clean-up to reach an adequate standard. • The clean-up and upgrading process involves three main steps: - removal of CO2 and trace contaminants - removal of H2S - drying BfGworkshop Sept 2011

  17. Bio-gas Upgrading Technologies • Water-Wash (Water Scrubber) (remove CO2 and H2S) • Chemical-Wash (Adsorption/amine/selexol scrubber) • Pressure Swing Adsorption (PSA/vPSA) • Cryogenic / CO2 liquefaction • Membrane Separation BfGworkshop Sept 2011

  18. Water-wash Source: cng services ltd BfGworkshop Sept 2011

  19. Chemical Wash Source: cng services ltd BfGworkshop Sept 2011

  20. Pressure Swing Adsorption Source: cng services ltd BfGworkshop Sept 2011

  21. Cryogenic Source: Xebec BfGworkshop Sept 2011

  22. Membrane Separation Source: cng services ltd BfGworkshop Sept 2011

  23. Technology types BfGworkshop Sept 2011

  24. Existing Projects • British Gas Demonstration Projects • To test a range of factors – feedstock, technology, return on investment, costs, sustainability, technical challenges, regulatory challenges, market opportunities BfGworkshop Sept 2011

  25. Source: British Gas BfGworkshop Sept 2011

  26. 2. Services • AD requires a range of support services as in the general bio-energy supply chain AD Plant in Germany Source: Wardell Armstrong BfGworkshop Sept 2011

  27. RESCO Bio-energy supply chain group review RESCO members AD Supply chain capability – Engineering & Manufacturing Principal EPC contractor Commissioning organisation 28 Operational Services Building & Construction Engineering & Manufacturing Professional & Technical services Structural Fabrication  Engineering Components  Materials Handling  Ducting & air Systems  Process Drying  Process Control  Digester Plant  Process Metrology  Maintenance services  Biogas Clean-up  Proprietary systems  BfG workshop Sept 2011

  28. RESCO Bio-energy supply chain group review RESCO members AD Supply chain capability – Professional & Technical Services Principal EPC contractor Commissioning organisation 10 Operational Services Building & Construction Engineering & Manufacturing Professional & Technical services Management Services  M&E services  Process Integration  Planning & Permitting  Modelling services  Environmentaldesign  EPC services  Engineering design  Architectural design  BfG workshop Sept 2011

  29. The plant requires a range of specialist equipment and services BfG workshop Sept 2011

  30. Services • There are still many services where producers still face challenges: • Oxygen content • CV setting and monitoring • Propane enrichment BfGworkshop Sept 2011

  31. Services • Gas clean-up plant • Propane enrichment • Metering and monitoring • Transport fuel • Odourisation • Gas grid injection BfGworkshop Sept 2011

  32. Services • Plant fabrication, installation, commissioning • Pipework, valves and fittings • Compressors, blowers and vacuum pumps • Pumps and process equipment (coolers, heat exchangers etc) • Instrumentation • Service and support Source: Xebec BfGworkshop Sept 2011

  33. 3. Feedstock • Sewage sludge • Agricultural waste (animal manure and slurries) • Food waste and biodegradable waste (garden) • Energy crops Source: AD Strategy and Action Plan, 2011 BfGworkshop Sept 2011

  34. Farm Energy Crops Animal Slurry Kitchen Waste Home Abattoir AD PLANT Sewage Slurry Abattoir Waste Retail Waste Process Waste Catering Waste Retail Factory BfGworkshop Sept 2011

  35. Feedstock Implications • Avoided waste to landfill • Avoided emissions from excessive food waste – but need to collect it efficiently • Energy crops are less desirable vs waste (secure food supply, environmental impact) • Bio-gas can be exported to the grid, but use of digestate is dependent on feedstock, e.g. Environmental permitting regulations, PAS 110. BfGworkshop Sept 2011

  36. 4. Future of biogas to grid in the UK and EU • Urban Energy Centres – combining waste to energy technologies to maximise efficiency. • Compressed Bio-methane (CBM) and vehicles • CBM/CNG vehicles • Already operating in Germany and are emerging in the UK, e.g. Veolia Econic refuse trucks in Sheffield • First CBM refuelling station in Europe at transport depot in Kings Cross – Camden council and Gasrec. • Coca-Cola HGVs • Leeds Council Biomethane fuel station • Mercedes Benz, Iveco, Volkswagen, BMC/Foten, Optare BfGworkshop Sept 2011

  37. Future of biogas to grid in the UK and EU • Already 60 plants connected to the grid in Germany (and constantly increasing in Switzerland, Holland and Sweden). • RHI is leading to increased uptake in the UK at all scales BfGworkshop Sept 2011

  38. On & off farm AD projects commissioned in the UK Off farm On farm August EBEBO workshop Sept 2011…

  39. On & off farm AD projects commissioned in the UK £m’s EBEBO workshop Sept 2011…

  40. Alan Midwinter Review of UK activity and case studies

More Related