GTK Submission Status. Sakari Tiuraniemi. TDC. CCNT. Read out logic. DLL. 45 Receivers. Hit Arbiter. End of Column layout is finished TDC+DLL and EOC-logic together, LVS match Transmission lines are ready and LVS match
E N D
GTK Submission Status Sakari Tiuraniemi
TDC CCNT Read out logic DLL 45 Receivers Hit Arbiter
End of Column layout is finished TDC+DLL and EOC-logic together, LVS match Transmission lines are ready and LVS match Place&route of TOP of 2xEOC+WG+MUX is finished (except for power lines and a few connections) Next: LVS for digital TOP (Jan’s design not included) Routing to PAD-ring LVS of digital TOP with PAD-ring Add Jan’s pixels Final TOP LVS Back to simulations Status and to do