1 / 5

GTK Submission Status

GTK Submission Status. Sakari Tiuraniemi. TDC. CCNT. Read out logic. DLL. 45 Receivers. Hit Arbiter. End of Column layout is finished TDC+DLL and EOC-logic together, LVS match Transmission lines are ready and LVS match

kimama
Download Presentation

GTK Submission Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GTK Submission Status Sakari Tiuraniemi

  2. TDC CCNT Read out logic DLL 45 Receivers Hit Arbiter

  3. End of Column layout is finished TDC+DLL and EOC-logic together, LVS match Transmission lines are ready and LVS match Place&route of TOP of 2xEOC+WG+MUX is finished (except for power lines and a few connections) Next: LVS for digital TOP (Jan’s design not included) Routing to PAD-ring LVS of digital TOP with PAD-ring Add Jan’s pixels Final TOP LVS Back to simulations Status and to do

More Related