Plate Pack Frame (PPF) Installation. Velcon Filters LLC 1210 Garden of the Gods Rd. Colorado Springs, CO 80907. A Velcon Filters, LLC PPF-466-110 Plate Pack Frame is shown in this demonstration.

kimama
Download Presentation

Plate Pack Frame (PPF) Installation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plate Pack Frame (PPF)Installation Velcon Filters LLC 1210 Garden of the Gods Rd. Colorado Springs, CO 80907

  2. A Velcon Filters, LLC PPF-466-110 Plate Pack Frame is shown in this demonstration.

  3. In order for the PPF system to work properly the vault must be clean and free of water and oil. A 466-SPA vault is shown in this demonstration.

  4. Locate the PPF on a firm flat area near the vault it will be installed in.Be sure the weirs are facing the inlet to the vault. Fiberglass top weir Cork side weirs Vault Inlet end

  5. Remove the packaging attached to the top channel. It contains the items used to secure the PPF in the vault. PPF Mounting Hardware PPF mounting components

  6. Before lowering the PPF into the vault, you need to form the cork side weirs to curve forward as shown in the detail view and temporarily tape or strap them in this position. Remove the tape of straps Only after the PPF mounting hardware is securely in place. The weirs will relax against the vault wall to form the seal. Detail View

  7. Predetermine the location the PPF will be in the vault before you start lowering it into the vault.

  8. The PPF will be lifted, located, and lowered into the vault by the cables located at the top of both side frames. Lifting cables

  9. Lift and locate PPF into positionto be lowered into vault.

  10. Lift and locate PPF into positionto be lowered into vault

  11. Lift and locate PPF into positionto be lowered into vault

  12. Lift and locate PPF into positionto be lowered into vault

  13. Lift and locate PPF into positionto be lowered into vault

  14. Lift and locate PPF into positionto be lowered into vault

  15. Lift and locate PPF into positionto be lowered into vault

  16. Lift and locate PPF into positionto be lowered into vault

  17. Lift and locate PPF into positionto be lowered into vault

  18. Lift and locate PPF into positionto be lowered into vault

  19. Lift and locate PPF into positionto be lowered into vault

  20. Lift and locate PPF into positionto be lowered into vault

  21. Lift and locate PPF into positionto be lowered into vault

  22. Lift and locate PPF into positionto be lowered into vault

  23. Lift and locate PPF into positionto be lowered into vault

  24. Lift and locate PPF into positionto be lowered into vault

  25. Lift and locate PPF into positionto be lowered into vault

  26. Lift and locate PPF into positionto be lowered into vault

  27. Lift and locate PPF into positionto be lowered into vault

  28. Lift and locate PPF into positionto be lowered into vault

  29. With the PPF located over its mounting location slowly lower it into the vault.

  30. With the PPF located over its mounting location slowly lower it into the vault.

  31. With the PPF located over its mounting location slowly lower it into the vault.

  32. With the PPF located over its mounting location slowly lower it into the vault.

  33. With the PPF located over its mounting location slowly lower it into the vault.

  34. With the PPF located over its mounting location slowly lower it into the vault.

  35. With the PPF located over its mounting location slowly lower it into the vault.

  36. With the PPF located over its mounting location slowly lower it into the vault.

  37. With the PPF located over its mounting location slowly lower it into the vault.

  38. With the PPF located over its mounting location slowly lower it into the vault.

  39. With the PPF located over its mounting location slowly lower it into the vault.

  40. With the PPF located over its mounting location slowly lower it into the vault.

  41. With the PPF located over its mounting location slowly lower it into the vault.

  42. With the PPF located over its mounting location slowly lower it into the vault.

  43. With the PPF located over its mounting location slowly lower it into the vault.

  44. With the PPF located over its mounting location slowly lower it into the vault.

  45. With the PPF located over its mounting location slowly lower it into the vault.

  46. With the PPF located over its mounting location slowly lower it into the vault.

  47. With the PPF located over its mounting location slowly lower it into the vault.

  48. With the PPF located over its mounting location slowly lower it into the vault.

  49. With the PPF located over its mounting location slowly lower it into the vault.

  50. With the PPF located over its mounting location slowly lower it into the vault.

More Related