PowerPoint Procedures

PowerPoint Procedures. Save this boilerplate briefing as follows: From the menu bar, select File - Save As Replace its name – IPM Briefing Shell.ppt with your team name* as follows: (write this down) I:A StudentTeam XTeamX12.ppt Go to the next slide and begin filling in the briefing.

kimcarlos
Download Presentation

PowerPoint Procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PowerPoint Procedures • Save this boilerplate briefing as follows: • From the menu bar, select • File - Save As • Replace its name – IPM Briefing Shell.ppt with your team name* as follows: (write this down) I:\A Student\Team X\TeamX12.ppt • Go to the next slide and begin filling in the briefing.

  2. Contract Status as of MMM YY Observations and Action Plan Team X

  3. Overview • Selected AT&L Trip Wire Metrics • Cost & Schedule Drivers • Critical Path to next two milestones • EACs & TCPIs • APB Issues • Management Charts ( 3) • Program Issues & Action Plan

  4. Selected AT&L Trip Wire Metrics • Schedule Metrics • BEI = • Contract Mods = • EVM Metrics • SPI = • CPI = • TCPI = • PMB Revisions =

  5. Cost and Schedule Drivers • 1 • 2 • 3

  6. Schedule Analysis – Critical Path

  7. Cost Trends • BAC • CPIcum • EAC Calculation Method • Price at Completion • Sufficient Funding?

  8. APB Issues • Performance • Schedule • Budget

  9. Key Level 1 Management Charts

  10. Key Level 1 Management Charts

  11. Key Level 1 Management Charts

  12. Issues & Way Ahead or Next Steps

  13. DAES Chart 1 (Program Status) Program Name:___________ Date:_________ Current month • Cost • Schedule • Performance • Funding • Comments:

  14. DAES Chart 2 (Issue Summary) Program Name:___________ Date:_________