An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LAX Landside Access Modernization Program Westside Regional Alliance of Councils January 20, 2016

  2. Landside Access Modernization Program CONRAC ConRAC STATION ITF WEST ITF EAST ITF WEST STATION METRO/ITF EAST STATION EAST STATION APM GUIDEWAY CENTER STATION Transforming LAX into a world class airport that provides high levels of passenger service, and direct access to transit and other regional facilities. WEST STATION CTA

  3. APM System Overview APM System ConRAC W ARBOR VITAE ST WEST ITF CTA Stations Metro 96th St. Station & Transit Center CENTURY BLVD AVIATION BLVD EAST ITF

  4. CTA Stations APM System CENTER WEST EAST APM GUIDEWAY

  5. APM Station Platform Concept Through Stations have center platforms Vertical circulation to the pedestrian walkway is at the end of the station platform

  6. APM Station Interior Concept

  7. CTA Pedestrian Walkways APM System ConRAC • Convenient connectivity to terminals • Moving walkways • Serves APM and CTA parking garages • Safety: Eliminates at-grade pedestrian crossings

  8. CONRAC and ITFs ConRAC W ARBOR VITAE ST WEST ITF CTA Stations Metro 96th St. Station & Transit Center CENTURY BLVD EAST ITF AVIATION BLVD

  9. Collaboration with Rental Car Companies ConRAC ConRAC • Most rental car companies own their own land and prefer their current operation. • 1,126,000 one-way trips made by individual rental car shuttles to/from the LAX Central Terminal Area from 9/1/14 through 8/31/15 • More than fifteen meetings with the industry, and many one-on-ones with major brand families • Explored over 20 design options – reached basic consensus on Preferred Alternative

  10. CONRAC Preferred Alternative/ Site Plan ConRAC • Consensus CONRAC Concept • Preferred Alternative components include: • Customer Service Building • Ready-Return Area • Idle Storage • Quick-Turn-Around (QTA) and Light Maintenance • Design Accommodations Include: • Streamlined Vehicle Flows • Split APM Boarding/De-boarding Platforms • Multi-Level Fueling/Car-Wash • Fleet Delivery • Secure Access by Brand Family • Emergency/Redundant Shuttle Curb W ARBOR VITAE ST Metro ConRACSTATION ITF EAST STATION ConRAC ITF EAST AVIATION BLVD CENTURY BLVD

  11. ITF Locations ITFs • ITFs provides new choices for passengers to access LAX via the APM system. • Allows LAWA to manage congestion and traffic in the CTA and the airport area. • Each ITF designed to serve particular markets. ITF WEST ITF EAST

  12. Transit Connection

  13. Metro – Overview & Connection Transit • Metro has agreed to build a 96th Street Station, to provide a rail and bus link to the airport. • LAWA has agreed to build an APM station above the planned 96th Street Metro Station to allow for quick and convenient transfers to LAX.

  14. LAWA-Metro Coordination Steering Committee Oversight Committee Technical Advisory Committee Environmental • APM/AMC Station Integration Crenshaw/APM Project Accommodations • Southwestern Maintenance Yard Real Estate • Outreach • Funding • Agency Coordination • Construction

  15. Roadway Improvements

  16. Roadway Improvements Roads • Roads • 2 miles of new roadways • 4.5 miles of improved roadways Additional lane (WB) Additional lane (WB) Additional lane (NB) New Roads Additional lane (SB) I 405 Additional lane (SB) 98th Street extended to I-405 Additional lane (EB) Improved I-405/ I-105 access Improved Century/ Sepulveda intersection

  17. Collateral Development Opportunities W ARBOR VITAE ST 405 MSF I 405 ITF WEST 96TH STREET ConRAC AIRPORT BLVD ITF EAST 98TH STREET AVIATION BLVD CENTURY BLVD CENTURY BLVD LAWA is working with LAX Gateway Business Improvement District to understand how residual property could be developed to serve existing hotel, office area which lacks retail, restaurant, and entertainment amenities.

  18. Sustainability Elements and Design Guidelines • Sustainability • Researching and identifying elements for consideration - such as solar power, renewable energy, use of reclaimed water, etc. • Following guidance from City of LA, as well as looking at practices at similar facilities Design Guidelines Develop Visual Theme Streetscape Plan Pedestrian Access I 405 EV Charging Stations, Portland International Airport Drought-Tolerant Landscaping, Sacramento International Airport Parking Lot Solar Panels, Santa Barbara Municipal Airport

  19. Stakeholder and Public Outreach • Extensive stakeholder and public involvement: • Presentations to business, community, and special interest groups • Briefings and meetings with affected jurisdictions to identify concerns • Project website • Launching social media engagement -

  20. Environmental Documentation Schedule

  21. Program Implementation Delivering a World-Class Transportation System

  22. Program Delivery Timeline APM and ConRAC operational in 2023

  23. LAMP Procurement Framework • Procurement Objectives • Control capital costs • Expedite delivery (Goal: no later than 2023) • Capture life cycle cost efficiencies • Capture economies of scale • Minimize construction impacts on existing LAX operations • Staff recommends Design-Build-Finance-Operate and Maintain (DBFOM) for the APM and CONRAC Projects. • Other Projects may use other delivery/procurement approaches. CONRAC Program Element APM ITFs Roads Transit Proposed Delivery Methods DBFOM DBFOM DB or 3rd Party TBD Metro

  24. Thank You! Additional Information: www.connectinglax.com Phone: 800.919.3766