HES Status Report Jan 27, ’09

HES Status Report Jan 27, ’09. EDC arrived …but. 1/23 午前中 に EDC 到着。 HV は無事 100V かかる。 午後ガスの配線を始める。全くリターンがない。 1/24, 25 ガス のラインで気になっていた部分を直すも変化なし。 1/26 HDC と EDC を並列につなぐがやはりだめ。今までアクセスできなかった EDC の下側のウィンドウを見るため Andy に頼んで EDC を 180deg 回転してもらった。 … 破れている。 1/27

kioshi
Download Presentation

HES Status Report Jan 27, ’09

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HES Status ReportJan27, ’09

  2. EDC arrived …but • 1/23 • 午前中にEDC到着。HVは無事100Vかかる。 • 午後ガスの配線を始める。全くリターンがない。 • 1/24, 25 • ガスのラインで気になっていた部分を直すも変化なし。 • 1/26 • HDCとEDCを並列につなぐがやはりだめ。今までアクセスできなかったEDCの下側のウィンドウを見るためAndyに頼んでEDCを180deg回転してもらった。…破れている。 • 1/27 • Tang先生のアイデアで敗れた個所をテープで補強。ガスを流し始め、リターンを確認。 • Next • ガス充満、commisioning

  3. 最新のアクセプタンス HES w/ collimator HES w/o collimator

  4. Beam Energy Scan • 手順 • Matrixは固定(標準状態のもの)。 • lambda, sigmaの種を作る時のBeam Energyを適当に変える。 • MMを組む時にBeam Energyとして本来のBeamEnergyを採用したものと固定したもの(2344MeV)を比較(ピークの中心値とs)。