MAVEN PFFSW STATUS 4/03/2012. Operational Status. Interface Documents, Meetings STATIC 3/8/12. Data processing email 28 -> 35 Telemetry Products ! STATIC Specification rev N, 3/29/12 SEP Specification rev C, 2/1/12. SWIA Specification rev H, 3/29/12
E N D
MAVEN PFFSW • STATUS • 4/03/2012
Operational Status Interface Documents, Meetings • STATIC 3/8/12. Data processing email 28 -> 35 Telemetry Products ! • STATIC Specification rev N, 3/29/12 • SEP Specification rev C, 2/1/12. • SWIA Specification rev H, 3/29/12 • DFB-DCB ICD rev E, 1/30/12 (15th revision, they count 1-10, A-E) Development • STATIC design, development and simulation • Generated V2.4 ramload for I&T of MAG, LPW and SEP • Tested Actuator (2-bit logic) at 1/64th full speed (RegSim relay needs to be replaced) • Installed RTS v 2 on DVF • Verified RTS is loaded and operates as expected • Installed LPW LUTs on DVF • SEP has not provided any LUTs • Developed FSW limit monitors specification & this was circulated to team • Developed I&T “punchlist” for instrumenters (RTS, LUTs, Tables) • Developed Limit Monitor data structure and logic • Developing GSEOS Displays to support MAG, LPW, SEP verification • Checked MAG1 Apid 26, 40, 42 compressed & uncompressed formats on DVF. OK • Checked LPW Apid 54 (the only one given by instrument simulator) • Checked SEP Apid 2B (only housekeeping given by instrument simulator) IV&V • Awaiting Info re. Level 5 Requirements Validation Report Next Up • Limit Monitors for I&T of MAG, LPW and SEP • Run through of Flight I&T of MAG, LPW and SEP on the ETU • Need to get agreement on RTS 0-5 , (Cold and Warm Resets, Safe, Normal, Eng modes) • Working on a packet-level compression specification
Reqts Issues No details available Normal to Reboot to start a new Operational program No details available
Reqts Moves Move from HSK to PWR Move from STA to FP
Reqts Build 3 SWIA Moments SWEA Pitch Angle Dists
Test Environment GSEOS Status: • Instrument simulation (working for MAG science, but others are housekeeping only) • Instrument simulation files for LPW, etc. need work. Need for each Instrument: • Case 1. Typical test pattern • Case 2. Anomaly test pattern (e.g Housekeeping violations) • Case 3. Worst case telemetry rate • Limit checking error messages in GSEOS • No limits are being checked GSEOS Python Test Scripts, Displays • # I&T Test Scripts Ready = 0 • # Engineering APIDs displayed : 10 of 13 (I added 26, 27 and 2B, 2C) • # Science APIDs displayed : 10 of 67 (I added 40-43, 50-54, 70) • # Total APIDs generated by Version 2.4 : 80
Charts CHARTS
Margin Chart Finished adding LUTs to EEPROM. None in Flash Calculations performed in Analyses.xls