An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OSHA 29 CFR Part 1926Cranes & Derricks In Construction Session Outline • 1926.1419 Signals – General • 1926.1420 Signals – Radio, etc. • 1926.1421 Signals – Voice • 1926.1422 Signals – Hand Signals • 1926.1427 Operator Certification & Qualification • 1926.1428 Signal Person Qualifications • 1926.1429 Training • Presented By: • Ted L. Blanton President NACB, Inc. tblantonsr@cranesafe.com (800) 654-5640 OSHA 1926.1400

  2. OSHA 29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • Employers Must Provide • Qualified Riggers • Assembly/Disassembly • 1926.1404 (r)(1) • Rigging Materials in the “Fall Zone” • 1926.1425 (c)(3) • Qualified Signal Persons • 1926.1428 OSHA 1926.1400

  3. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • Signal Persons are discussed throughout the 1400 standard. • 1419 Signals – General • 1420 Signals – Radio, etc. • 1421 Signals – Voice • 1422 Signals – Hand Signals • 1428 Signal Person Qualifications OSHA 1926.1400

  4. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • Definitions • Qualified Rigger • a “Qualified Rigger” is a rigger who meets the criteria for a “Qualified Person” • Qualified Person • means a person who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training and experience, successfully demonstrated the ability to solve/resolve problems relating to the subject matter, the work, or the project. OSHA 1926.1401

  5. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • How To Document a Qualified Persons ability to solve/resolve work related problems (i.e. rigging, etc.) • Academic • Degree (engineering, etc.) • Journey Level Certification (DOE Approved Apprentice Program) • National Certification (NCCER, NCCCO, CIC, etc.) • Certificate of Training from a National Training Organization (NACB, CICB, CIA, etc.) • Proof of Professional Standing OSHA 1926.1401

  6. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • How To Document a Qualified Persons ability to solve/resolve work related problems (i.e. rigging, etc.) • Experience • Proof of Training • Certificate of Training • Training Records • Successful Completion of a Written Examination • Proof of Experience • Work Records • Resume • Successful Completion of a Practical Examination OSHA 1926.1401

  7. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • 1419 States that a signal person must be provided in each of the following situations: • The point of operation, meaning the load travel or the area near or at load placement, is not in full view of the operator. • When the equipment is traveling, the view in the direction of travel is obstructed. • Due to site specific safety concerns, either the operator or the person handling the load determines that it is necessary. OSHA 1926.1419

  8. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • Effective 11/8/2010 Employers Must; • Ensure Operators Are Competent And Safe (1926.1427 (k)) • Trained & Evaluated • Certification Requirements Effective Nov.10, 2014 OSHA 1926.1427

  9. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 10, 2014 • Effective 11/10/2014 Employers Must; • Ensure Operators Are Qualified & Certified (1926.1427(a)) • 1926.1427 (b) Option 1) Certified by an Accredited Crane Operator Testing Organization • NCCER • NCCCO (CCO) • CIC • Other • Must be Portable • Must be Valid For 5 Years OSHA 1926.1427

  10. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 10, 2014 • Effective 11/10/2014 Employers Must; • Ensure Operators Are Qualified & Certified • 1926.1427 (c) Option 2) Qualification by an Audited Employer Program • Written & Practical Testing • Audited By an Option 1 Organization • May Not be Portable • Must be Valid For 5 Years OSHA 1926.1427

  11. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 10, 2014 • Effective 11/10/2014 The following applies; • Pre-Qualification/Certification Training Period (1926.1427 (f)) • All Operators Not Certified May Only Operate As An Operator-in-training (OIT). • Must Be Provided Sufficient Training • Tasks Performed During Training Within Trainees Capability • Trainer • Employee or Agent • Certified Operator, or • Passed Written • Familiar with Controls • No Distractions OSHA 1926.1427

  12. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • 1428 Signals –Signal Person Qualification: • Ensure Signal Persons Are Qualified (2 Options) • Option1) 3rd Party, or • Option 2) In-House Qualified Evaluator OSHA 1926.1428

  13. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • 1428 Signals –Signal Person Qualification: • Qualification Requirements • Know & Understand Types of Signals to be Used • Be Competent in there Application • Have a Basic Understanding Of Equipment; • Operation & Limitations • Load Dynamics • Swinging & • Stopping of Load • Boom Deflection from Hoisting OSHA 1926.1428

  14. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • 1428 Signals –Signal Person Qualification: • Qualification Requirements • Know & Understand • 1926.1419 • 1926.1420 • 1926.1421 • 1926.1422 & • 1926.1428 • Demonstrate Requirements Through both; • Written (or Oral) Testing • Practical Testing. OSHA 1926.1428

  15. OSHA §29 CFR Part 1926Cranes & Derricks In Construction Effective Date: November 8, 2010 • Effective 11/8/2010 Employers Must; • Have Provided Training as Follows: • On Overhead Power Lines • To Signal Persons • To Operators • To Competent & Qualified Persons • On Crush/Pinch Points • On Tag-Out • Training Administration OSHA 1926.1430