An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Derbyshire GP consortia: information and options GP Commissioning Transition Committee November 2010

  2. Aims • Further detail on financial risk; PCT function; corporate costs; etc • Options for possible future forms for GP Commissioning Organisations • Criteria against which these options could be assessed & initial analysis • Process and timeline to make a proper ‘bottom up’ decision

  3. Information: financial risk • Variation and therefore risk, works on a square root calculation i.e. a four fold increase in population results only in a two fold increase in risk. • Approximate risk/ variation: 10k population = 19% variation; 50k = 8%; 100k = 6%; 500k = 3%; 1m = 2% • Higher cost procedures = higher risk • Risk can be offset in three ways: • Increasing the population covered • Capping the cost of any single event • Restricting the procedures commissioned by size

  4. Current financial risk • All but two consortia overspent in 09/10 (Bog & Limes) • All overspent on historic budget • All but three consortia predicting overspend in 10/11 • September 2006 – 4 of 6 old PCTs in deficit (all but Chesterfield & North East)

  5. Corporate function & costs • First draft PCT prospectus by department • High level costs by directorate • Estimate of GP leadership: pool of 20-30 GPs for a consortium? • Current PBC funding £1.90/head (£1.4m); already 20% of total funding?

  6. Geographical options Option 1 a) A whole County GPCC including Derby City PCT b) A whole County GPCC excluding Derby City PCT  Option 2 • Separate North and South Derbyshire GPCC with the South including Derby City • Separate North and South Derbyshire GPCC with the South excluding Derby City  Option 3 • Multiple (6-10?) small GPCC around the County and City

  7. Larger consortia description • Umbrella organisations comprising semi-autonomous localities & holding statutory responsibility • Localities take responsibility for all they can, delegating up where appropriate • Consortia could determine structure, size of localities and level of responsibility • Could be north/south; Derby City in or out • Could be interim arrangement, hosting localities that ultimately spin off - stand alone/cross border

  8. Smaller consortia description • Stand alone statutory organisations, pooling risk with other organisations • Minimum size undefined but financial risk, clinical capacity, management funding and corporate overheads - at least 100k? • Develop lead commissioner roles for contracting and links with Local Authorities

  9. Options appraisal: large v. small

  10. Management options Option 1: Consortium employs most staff & does tasks in house. PCT staff would be eligible for TUPE Option 2 PCT staff set up stand alone commissioning organisation & GPCC contract from them Option 3 GPCC contract to private sector for functions  Option 4 A mix of any of the above as desired by GPCC

  11. Process moving forward • GP consortia chairs to take the options back to consortia – return with initial view to December’s meeting • A one day symposium with Consortia Chairs & others • Continued LMC events • Transition Committee to feedback their consortia’s preferred option in December to provide context for; • Wider GP community vote on preferred option in January 2011 • Set up a small project team to implement work • Continue work on public & LA engagement • Agree management support funding for consortia for 10/11, devolve PBC engagement fund £1.90/head as real budget • GP pathfinder/s established to ‘fast track’ within overall health community plan