1 / 6

OmniRAN EC SG Liaison Report to IEEE 802.11

OmniRAN EC SG Liaison Report to IEEE 802.11. Date: 2014-03-20. Authors:. OmniRAN EC SG Liaison Report to IEEE 802 WGs. OmniRAN EC SG Chair: Max Riegel (NSN) 2014-03-20. OmniRAN EC SG Status and Outlook.

kiral
Download Presentation

OmniRAN EC SG Liaison Report to IEEE 802.11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OmniRAN EC SG Liaison Reportto IEEE 802.11 • Date: 2014-03-20 Authors: Max Riegel (NSN)

  2. OmniRAN EC SG Liaison Reportto IEEE 802 WGs OmniRAN EC SG Chair: Max Riegel (NSN) 2014-03-20

  3. OmniRAN EC SG Status and Outlook • OmniRAN PAR proposal on IEEE 802.1CF Recommended Practice: ‘Network Reference Model and Functional Description of IEEE 802 Access Network’ was approved by IEEE 802 EC on November 15th, 2013 • https://mentor.ieee.org/omniran/dcn/13/omniran-13-0096-00-ecsg-approved-par-clean.pdf • The PAR is on the NesCom agenda for approval on March 26th, 2014 • IEEE 802.1CF project starts after NesCom approval • OmniRAN EC SG was extended in November 2013 until March 2014 to take care of the PAR approval by NesCom. • OmniRAN EC SG will ask for another extension in the EC closing plenary, just for the case that NesCom asks for additional input. • A Study Group is disbanded upon approval of the PAR by the IEEE-SA Standards Board.

  4. OmniRAN after the approval of the P802.1CF PAR • IEEE 802.1 decided to establish an ‘OmniRAN TG’ for the P802.1CF project. • To facilitate close cooperation with the other IEEE 802 WGs, the OmniRAN TG will • continue with the OmniRAN filespace on mentor for convenient exchange of documents with members of the other IEEE 802 WGs • meet when appropriate at interims with the wireless working groups • try to arrange for reciprocal attendence credits with the other IEEE 802 WGs (procedural details still to be clarified).

  5. Envisioned activities of 802.1 OmniRAN TG until July F2F • Continue the work on the following topics: • Wireless Access Setup • Network Discovery and Selection • Point-to-point links across bridged infrastructures • SDN specification needs in P802.1CF • Meetings, teleconferences • Teleconference (late April, date t.b.d.) • 2 full days F2F meeting in Norfolk, VA • Teleconference (mid June, date t.b.d.)

  6. Second Wireless SDN BoFThu, Mar 20th, AM1 • Three presentations with discussions • Outcome of the Wireless BoF in Jan 2014 (Roger Marks) • https://mentor.ieee.org/omniran/dcn/14/omniran-14-0025-00-0000-outcome-of-wireless-sdn-bof-meeting-of-2014-01-23.pdf • Software Defined Networking Supported by IEEE 802.1Q (Janos Farkas) • http://www.ieee802.org/1/files/public/docs2014/Q-farkas-SDN-support-0314-v01.pdf • http://www.ieee802.org/802_tutorials/2013-03/8021-IETF-tutorial-final.pdf • SDN OmniRAN usecases (Juan Carlos Zuniga) • https://mentor.ieee.org/omniran/dcn/14/omniran-14-0029-00-0000-sdn-based-use-cases-for-bof.pptx • Conclusions: • Set up a dedicated mailing list for the Wireless SDN topic • Organize for a further Wireless SDN BoF at July plenary meeting • Establish communication with ONF

More Related