Road Work Scheduled for the week of July 5 th – July 10 th

Road Work Scheduled for the week of July 5 th – July 10 th. Additional Work Scheduled for the month of July. Road Name Type of Work to be performed Estimate project duration Honey Lane Paving in Drainage Repair 2 Days Leopard Drive Drainage repair 5 - 7 Days

kirsi
Download Presentation

Road Work Scheduled for the week of July 5 th – July 10 th

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Road Work Scheduled for the week ofJuly 5th – July 10th Additional Work Scheduled for the month of July Road NameType of Work to be performed Estimate project duration Honey Lane Paving in Drainage Repair 2 Days Leopard Drive Drainage repair 5 - 7 Days New Lebbon Road Drainage 4 – 5 Days Newbury Road Drainage 2 - 3 Weeks Sandy Hook Water Main Installation of Water Main 60 Days Road NameType of Work to be performed Estimate project duration Hi Barlow/Hattertown Road Drainage and pavement repair5 Days Jordan Hill Road Drainage repair and pavement overlay 6 - 8 Days Brookbridge Drive Drainage 1 – 2 Days Honey Lane Drainage 6 - 8 Days • Weather and emergencies can alter this schedule • Expect delays during construction • Be cautious in work areas, vehicles enter work zones at their own risk.

More Related