1 / 20

Target & Capture for PRISM

Target & Capture for PRISM. Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK). Contents. Targetry for PRISM Solenoid capture Conducting Target Summary. What’s PRISM. PRISM ( P hase R otation I ntense S low M uon source)

kizzy
Download Presentation

Target & Capture for PRISM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)

  2. NufactJ03 May 16-17, 2003, TMU Contents • Targetry for PRISM • Solenoid capture • Conducting Target • Summary

  3. NufactJ03 May 16-17, 2003, TMU What’s PRISM • PRISM( Phase Rotation Intense Slow Muon source) • A dedicatedsecondarymuon beam channelwithhigh intensity(1011~1012m/s)and • narrow energy spread(a few%) for stopped muon experiments Pion Capture FFAG PhaseRotator Sensitivity ~100 x MECO

  4. NufactJ03 May 16-17, 2003, TMU Requirements of the Target for PRISM • Pion Momentum • ~100 MeV/c • backwardscapture sheme available! • Emittance • As low as FFAG acceptance • horizontal 10000p, vertical 3000p • Method • Solenoidal Capture • Conducting Target

  5. NufactJ03 May 16-17, 2003, TMU Solenoidal Capture • Capture • Maching section • Decay section • Emittance • B field π R(m) B(T) π

  6. NufactJ03 May 16-17, 2003, TMU Simulation Setup • Simulation code • MARS, GEANT3 • 12 T field -> 3T • 47MeV/c ~ 85 MeV/c • Backward • 2000 p ~ 3000 p vertical acceptance 3 T proton 12 T

  7. NufactJ03 May 16-17, 2003, TMU Simulation Results • Target material • W is better than C • B field • Determined by Capture field • Target Radius • Loss due to hit target • Reabsorption • Yield of pion • 0.002~0.006 muon/proton

  8. NufactJ03 May 16-17, 2003, TMU SC Solenoid in High Rad. Env • Thick radiation shield is necessary • Yokoi’s Technote • ~100 W • Radiation shield of 34 cm in thickness is needed • Large bore for absorber • High stored energy • Extremely expensive • Design • Need precise heat load data • Experimental data is necessary! SC Coil Absorber 34 cm, 100W Thickness of Absorber

  9. NufactJ03 May 16-17, 2003, TMU Beam experiment with R&D Magnet • Beam test with R&D mag • Direct measurement of heat load by radiation • Study behavior of magnet under heating condition • R&D Magnet • 10 T hybrid SC coil • Cryo cooler • He free • Compact • Y. Kuno, A. Yamamoto • KEK PS • 12 GeV proton • 1011 proton/s

  10. NufactJ03 May 16-17, 2003, TMU Around ’95 Palmer et . al 1995

  11. NufactJ03 May 16-17, 2003, TMU Target for n-Fact in US

  12. NufactJ03 May 16-17, 2003, TMU Comparison

  13. NufactJ03 May 16-17, 2003, TMU REALISM • Baseline option • B=6T • Φ=800mm, L=1200 • Graphite Target L=2λ=800mm • Still Need R&D • ~500 W heat is deposited in SC coil • Quench protection • Radiation safety

  14. NufactJ03 May 16-17, 2003, TMU R&D Plan • Cooling Method ~500W • Pool boiling • Thermo siphon (Using convection) • R&D Coil will be constructed this year • Half or Quarter size • Heating using AC LOSS • Or Special heater • Engineering Design -> Future Upgade

  15. NufactJ03 May 16-17, 2003, TMU Conducting Target • Confine pions inside the target with troidal field • B. Autin, @Nufact01 • Advantage over Solenoid • Low emittance beam • Linear transport element • No SC solenoid channel • Cheaper! • Cooling condition better?

  16. NufactJ03 May 16-17, 2003, TMU Basic Priciple Acceptance Proton B. Autin et al. (Inside the target)

  17. NufactJ03 May 16-17, 2003, TMU Comparison of target material • Mercury is good candidate • Minimum Power • Easy to cooling • Higher pion yield • Technical Issues • How to cut off electrical circuit? • Container • Shockwave • Cavitation • Thicker wall can be used! • No reabsorption B. Autin et al.

  18. NufactJ03 May 16-17, 2003, TMU Setup for current test • 1st phase • 1000 A DC • 100 J • 2nd phase • 250 KA 2.5ms Pulse (K2K horn PS) • 15 KW • 3rd phase • 1 MW? • Beam test? Y. Yamanoi

  19. NufactJ03 May 16-17, 2003, TMU Mercury Test Loop • Mercury 18 litter ~ 250 kg • Study mercury flow

  20. NufactJ03 May 16-17, 2003, TMU Summary • Solenoidal Capture • Standard scheme • Beam test was successfully performed using the mockup • Design parameters will be considered. • Realistic R&D Model coil • Conducting Target • Lot of merits • R&D Work has just started! • Proof of principle • Feasibility test of High current liquid target

More Related