Data from collimation setting up, beam dump 06-MAR-11 17.55.02
Data from collimation setting up, beam dump 06-MAR-11 17.55.02. beam dumped by BLMQI.06L5.B2E21_MQM_XRP integration time 20.9s. Data from collimation setting up, beam dump 06-MAR-11 17.55.02. Data from collimation setting up, beam dump 06-MAR-11 17.55.02. Temperatures in magnet.
196 views • 8 slides