PROYECTO EJECUTIVO DE DRENAJE PLUVIAL EN LA ZONA CENTRO DE LA CIUDAD DE PIEDRAS NEGRAS,COAH.

PROYECTO EJECUTIVO DE DRENAJE PLUVIAL EN LA ZONA CENTRO DE LA CIUDAD DE PIEDRAS NEGRAS,COAH. 2008. TALAMANTES. Sistema General. LIC. VERDAD. LIBERTAD. PUEBLA. PUEBLA. P.MIER. COLÓN. COLÓN. ANÁHUAC. RÍO BRAVO. BRAVO. PERIODISTAS. ALDAMA. JIMÉNEZ. JIMÉNEZ. CAMINO REAL BRIDGE.

kolton
Download Presentation

PROYECTO EJECUTIVO DE DRENAJE PLUVIAL EN LA ZONA CENTRO DE LA CIUDAD DE PIEDRAS NEGRAS,COAH.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROYECTO EJECUTIVO DE DRENAJE PLUVIAL EN LA ZONA CENTRO DE LA CIUDAD DE PIEDRAS NEGRAS,COAH. 2008

  2. TALAMANTES Sistema General LIC. VERDAD LIBERTAD PUEBLA PUEBLA P.MIER COLÓN COLÓN ANÁHUAC RÍO BRAVO BRAVO PERIODISTAS ALDAMA JIMÉNEZ JIMÉNEZ CAMINO REAL BRIDGE ABASOLO JUÁREZ H. COLEGIO MILITAR MATAMOROS TERÁN TERÁN ADOLFO LÓPEZ MATEOS ANÁHUAC ALLENDE GUERRERO RAYÓN RAYÓN MINA EMILIANO CARRANZA XICOTÉCNATL DR. COSS CAMINO REAL BRIDGE DR. COSS DE FUENTE TORNILLO II

  3. TALAMANTES Captación: Torrenteras LIC. VERDAD 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 6 LIBERTAD PUEBLA PUEBLA P.MIER 8 7 6 5 4 3 2 1 COLÓN 1 2 3 4 5 6 7 ANÁHUAC RÍO BRAVO BRAVO PERIODISTAS ALDAMA JIMÉNEZ CAMINO REAL BRIDGE ABASOLO JUÁREZ H. COLEGIO MILITAR MATAMOROS TERÁN ADOLFO LÓPEZ MATEOS ANÁHUAC ALLENDE GUERRERO RAYÓN MINA EMILIANO CARRANZA XICOTÉCNATL DR. COSS CAMINO REAL BRIDGE DE FUENTE

  4. TERÁN Tránsito Hidrológico (Rayón) ALLENDE RÍO BRAVO GUERRERO Q=0 .5 Q=0.157 Q=0 .4 Q=0 .5 RAYÓN XICOTÉCNATL 1 2 3 4 MINA DR. COSS PADRE DE LAS CASA HIDALGO ZARAGOZA OCAMPO MORELOS DE FUENTE ADUANA Q=m3/seg ADUANA

  5. Diseño Hidráulico (Rayón) CALLE PADRE DE LAS CASAS C. OCAMPO C. MORELOS C. ZARAGOZA C. HIDALGO DESCARGA LIBRE COTA: 218.81 218.05 DRENAJE SANITARIO 0.50-30”-0.0020-125.32m 0.50-30”-0.0020-99.05m 0.40-26"-0.0020-95.11m 0.157-22”-0.0020-82.62m DREN PERIMETRAL ∅ 91 CM Q= m3/seg - ∅ - S - L

  6. Diseño (Detalles) PLANTA PERFIL

  7. Proyecto (Planta y perfil) 2 RAYON

  8. Proyecto (Planta y perfil) 2 COSS

  9. Proyecto (Planta y perfil) 2 COSS

  10. Proyecto (Planta y perfil) 3 TERAN

  11. Proyecto (Planta y perfil) 3 TERAN

  12. Proyecto (Planta y perfil) 4 JIMENEZ

  13. Proyecto (Planta y perfil) 4 JIMENEZ

  14. Proyecto (Planta y perfil) 4 COLON

  15. Proyecto (Planta y perfil) 4 COLON

  16. Presupuesto