An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1/21/2010 Cost Allocation for 2009 STEP, Appendix B: Comparison of Highway/Byway/Local v. Currently Effective Cost Allocation Methods

  2. General Study Notes • Committed ATRRs Include: • Legacy Tariff Rates, Attachment H, Column 3, ATRR $665M/yr • Previously Allocated Projects from the STEP plan, year 2006 to present, ATRR $342M/yr • Balanced Portfolio, E&C $770M, ATRR $131M/yr • Nebraska Transition Projects, E&C $171M, ATRR $23M/yr • Total Committed ATRR $1.16B/yr • 2009 STEP Projects Needing NTCs Allocated with Currently Effective Base Plan Funding Method: • 4-year economic commitment window: E&C $1.03B, ATRR $172M/yr • 2-year economic commitment window: E&C $791M, ATRR $102M/yr • Total ATRR Studied = Committed ATRR + 2009 STEP ATRR • 4-year window: $1.16B/yr + $172M/yr = $1.33B/yr • 2-year window: $1.16B/yr + $102M/yr = $1.26B/yr

  3. Cost Allocation Comparison • Currently Effective Rates and Base Plan Funding Method is used to Develop the Base Case • Highway/Byway/Local Method Applied to the 2009 Appendix B Projects is used to Develop the Change Case • Comparisons are calculated between the two

  4. Base Case: Currently Effective Method • 2009 STEP Appendix B projects are Allocated using the Currently Effective Base Plan Funding Method • Gross ATRR = Project E&C * Host Zone Carrying Charge • Zonal Allocation = 0.67 * Gross ATRR * Project’s MW-mi impact percentage for each Rate Zone • Regional Allocation = 0.33 * Gross ATRR * Load Ratio Share (LRS) for each Rate Zone

  5. Change Case: Highway/Byway/Local Method • Facilities over 300 kV (Highway), 100% Regionalized • Gross ATRR * LRS • Facilities between 100kV and 300kV (Byway), Split Allocation • 0.67 * Gross ATRR directly Rate host zone • 0.33 * Gross ATRR by LRS Rate region • Facilities under 100kV (Local), 100% Zonal • Gross ATRR directly assigned Rate host zone

  6. Change Case Notes (cont.) • Option 7: Comparative Cost Allocation for 2009 STEP Appendix B projects with NTCs needed in years 1 through 4 using the Highway/Byway/Local methodology v. Base. • Option 8: Comparative Cost Allocation for 2009 STEP Appendix B projects with NTCs needed in years 1 and 2 using the Highway Byway Methodology v. Base. Projects with NTCs needed in years 3 and 4 are not included. • Option 9: Comparative Cost Allocation for 2009 STEP Appendix B projects with NTCs needed: • In years 1 and 2 using Base Plan Funding methodology • In years 3 and 4 using the Highway/Byway/Local methodology

  7. Results (see attachments) • Graphical results and summary tables are presented for: • % Difference = (Change Case – Base Case) / Base Case * 100% • ATRR by Rate Zone = Committed ATRR + Allocation of the 2009 STEP • Base Case (Base Plan Funding Method) • Option 7: Highway Byway for years 1 through 4 of 2009 STEP, App. B • Option 8: Highway Byway for years 1 and 2 of 2009 STEP, App. B, do not consider years 3 and 4 • Option 9: Base Plan Funding years 1 and 2, Highway Byway for years 3 and 4 of 2009 STEP, App. B

  8. List of Attachments • Graph: Total ATRR Shown with Committed ATRR • Graph: Total ATRR Shown as Zonal and Regional Components • Graph: Total ATRR Shown as Highway, Byway, and Local Components • Graph: 2009 STEP Appendix B Total ATRR's 4-Year Economic Window: Currently Effective Method v. Highway/Byway/Local Method • Graph: % Difference Total ATRR 4-Year Economic Window: Currently Effective Method (Base) v. Highway/Byway/Local (Change) • Graph: 2009 STEP Appendix B Total ATRR's 2-Year Economic Window:Currently Effective Method v. Highway/Byway/Local Method • Graph: % Difference ATRR 2-Year Economic Window: Currently Effective Method (Base) v. Highway/Byway/Local (Change)

  9. List of Attachments, cont. • Graph: 2009 STEP Appendix B Total ATRR's 4-Year Economic Window:Year 1-4: Currently Effective Method v. Year 1-2 Currently Effective Method, Year 3-4: Highway/Byway/Local Method • Graph: 2009 STEP Appendix B Total ATRR's 4-Year Economic Window: • Option 7 v. Option 9 • Graph: % Difference Total ATRR, 4-Year Economic Window:Currently Effective Method (Base) v. Yr 1-2 Current, Yr 3-4 H/B/L(Change) • Summary Table: Base Case • Summary Table: Option 7 • Summary Table: Option 8 • Summary Table: Option 9

  10. List of Attachments, cont. • Project Data: 4-Year Window • Project Data: 2-Year Window • Summary Data for Charts • Area Data