MONTE RIO POWER PLANT

MONTE RIO POWER PLANT. Monte Rio – Original 3 Dimensional Drawing – Actual Plant. NOV 2001. MONTE RIO POWER PLANT. Basic Project Specifications – 101 MWe. Owner: Monte Rio Power Corporation, Ltd.

kovit
Download Presentation

MONTE RIO POWER PLANT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MONTE RIO POWER PLANT Monte Rio – Original 3 Dimensional Drawing – Actual Plant NOV2001

  2. MONTE RIO POWER PLANT Basic Project Specifications – 101 MWe Owner: Monte Rio Power Corporation, Ltd. Contractors: Energy International, HMV Engineers, Caterpillar International Power systems, and SEG/AVK Engines: 13 Cat Gensets model 9CM43 manufactured in Germany, with rated output of 8100 kW @ 514 RPM Fuel: 700 cSt/50 C heavy fuel oil Application: Independent Power Plant to Public Utility Generator: 3 Phase synchronous generator 9,758 kVA, 13.8 kV, 60 Hertz Switchyard: 138 kV double bus bar substation, 3 transformers 47/70 MVA ONAN/ONAF, 13.2/138 kV, 2 line bays, control and monitoring Switchgear: High Voltage, low voltage, control and monitoring Waste Heat Boiler: Exhaust gas fired steam boiler 7493 kg/h (4849 kW) at 8 bar(g) NOV2001

  3. MRPC - Chronological Progress Report MONTERIO 100 MW POWER PLANT PERSONAL EN OBRA DAY NIGHT CONTRACTOR STAFF LABOR TOTAL STAFF LABOR TOTAL HMV 97 263 360 ENERGY INTER. 2 2 CODEMON 43 279 322 2 62 64 TERMOTECNICA 2 23 25 METAL AMERICA 6 26 32 CONELCA 12 49 61 CEMEX 11 12 23 SECURITY 8 8 8 8 TOTAL 833 72 NOV2001

  4. MRPC - Chronological Progress Report SITE LOCATION NOV2001

  5. Site Preparation DEC2001

  6. MRPC - Chronological Progress Report 2001 JAN 2002

  7. MRPC - Chronological Progress Report 2001 JAN 2002

  8. MRPC - Chronological Progress Report 2001 FEB 2002

  9. MRPC - Chronological Progress Report 2001 MAR 2002

  10. MRPC - Chronological Progress Report Base No. 10 Base No. 9 Base No. 8 2001 MAR 2002

  11. MRPC - Chronological Progress Report 2001 MAR 2002

  12. MRPC - Chronological Progress Report 2001 APR 2002

  13. MRPC - Chronological Progress Report 2001 APR 2002

  14. MRPC - Chronological Progress Report 2001 MAY 2002

  15. MRPC - Chronological Progress Report 2001 MAY 2002

  16. MRPC - Chronological Progress Report 2001 MAY 2002

  17. MRPC - Chronological Progress Report 2001 JUN 2002

  18. MRPC - Chronological Progress Report 2001 JUN 2002

  19. MRPC - Chronological Progress Report 2001 JUN 2002

  20. MRPC - Chronological Progress Report 2001 JUL 2002

  21. MRPC - Chronological Progress Report 2001 JUL 2002

  22. MRPC - Chronological Progress Report 2001 AUG 2002

  23. MRPC - Chronological Progress Report 2001 AUG 2002

  24. MRPC - Chronological Progress Report 2001 AUG 2002

  25. MRPC - Chronological Progress Report 2001 SEP 2002

  26. MRPC - Chronological Progress Report 2001 SEP 2002

  27. MRPC - Chronological Progress Report 2001 OCT 2002

  28. MRPC - Chronological Progress Report 2001 OCT 2002

  29. MRPC - Chronological Progress Report 2001 OCT 2002

  30. MRPC - Chronological Progress Report 2001 NOV 2002

  31. MRPC - Chronological Progress Report 2001 NOV 2002

  32. MRPC - Chronological Progress Report 2001 NOV 2002

  33. MRPC - Chronological Progress Report 2001 DEC 2002

  34. MRPC - Chronological Progress Report 2001 DEC 2002

  35. MRPC - Chronological Progress Report 2001 DEC 2002

  36. MRPC - Chronological Progress Report 2001 2002 2003

  37. MRPC - Chronological Progress Report 2001 2002 JAN 2003

  38. MRPC - Chronological Progress Report Testing of Units 2001 2002 FEB 2003

  39. MRPC - Chronological Progress Report Commercial Operations – April 2003 2001 2002 MAR 2003

  40. MRPC - QUANTITIES OF MATERIALS SUPPLIED CIVIL WORKS DESCRIPTION ITEM UNIT QUANTITY 1 EARTHMOVING M3 69,015.0 2 PILINGS (3,872M3 OF CONCRETE) M (linear) 17,400.0 2 M3 CONCRETE 8,616.2 2.1 M3 CONCRETE FOR ENGINE BASES 2,188.0 2.2 STRUCTURAL CONCRETE M3 5,108.2 2.3 CONCRETE FOR INTERNAL ROADS (8,800 M2) M3 1,320.0 3 REINFORCED STEEL TON 1,212.6 4 995.2 METAL STRUCTURES TON 4.1 METAL STRUCTURE FOR POWERHOUSE TON 620.0 4.2 STRUCTURES FOR SMOKESTACKS TON 216.2 4.3 STRUCTURES FOR THE SUB-STATION TON 52.9 4.4 STRUCTURES FOR SIDING TON 33.9 4.5 ESTRUCTURE TO SUPPORT SILENCERS TON 7.2 4.6 PLATFORMS AND LADDERS TON 65.0

  41. MRPC - QUANTITIES OF MATERIALS SUPPLIED CIVIL WORKS DESCRIPTION ITEM UNIT QUANTITY 5 BUILDINGS M2 6,402.6 5.1 ADMINISTRATIVE BUILDING M2 455.4 5.2 GUEST HOUSE M2 352.1 5.3 FUEL TREATMENT HOUSE M2 184.0 5.4 POWER HOUSE M2 5,008.0 5.5 SUBSTATION M2 176.8 5.6 GATE HOUSE M2 15.3 5.7 INCINERATOR ENCLOSURE M2 26.0 5.8 SOLID WASTE MATERIAL ENCOLOSURE M2 33.4 5.9 WATER PUMP HOUSE M2 60.0 5.10 ENCLOSURE FOR SUBESTACION - GUEST HOUSE M2 31.0 5.11 EMERGENCY GENSET ENCLOSURE M2 43.2 5.12 17.5 ENCLOSURE EMERGENCY BATTERYS–POWER HOUSE M2 6 PERIMETER FENCING M (linear) 1,175.0

  42. MRPC - QUANTITIES OF MATERIALS SUPPLIED MECHANICAL ERECTION DESCRIPTION ITEM UNIT QUANTITY 1 PIPING 1.1 PREFABRICATION OF PIPING TON 169.1 1.2 PIPING ERECTION TON 289.8 2 MECHANICAL ERECTION OF EQUIPMENT TON 2,962.1 2.1 ERECTION OF ENGINES (9CM43-13 UND) TON 1,599.0 2.2 ERECTION OF GENERATORS (13 UND) TON 455.0 2.3 CHIMENEY STACKS (DIAMETER 1,220 MM) TON 129.4 2.4 EXHAUST DUCTS TON 27.7 2.5 COMBUSTION DUCTS TON 12.2 2.6 33.4 VENTILATION DUCTS TON 2.7 ERECTION AUX. EQUIPMENT SKID MODULES TON 372.5 2.8 AIR DUCTS TON 3.9 2.9 BOILER ASH TANK TON 1.4 2.10 RADIATORS FOR COOLING WATER TON 214.9 2.11 VENTILATION FANS MECHANICAL ANNEX, FUEL TREATMENT ENCLOSURE AND OTHERS TON 6.0 2.13 VENTILATION FANS FOR POWER HOUSE TON 89.6

  43. MRPC - QUANTITIES OF MATERIALS SUPPLIED MECHANICAL ERECTION DESCRIPTION ITEM UNIT QUANTITY 2.14 DIESEL EMERGENCY GENEREATOR TON 3.1 3 ERECTION OF PROCESS TANKS TON 76.4

  44. MRPC - QUANTITIES OF MATERIALS SUPPLIED ELECTRICAL ERECTION DESCRIPTION ITEM UNIT QUANTITY 1 LAYING OF MULTI-CONDUCTOR CABLE Km 72.9 2 LAYING OF MV CABLE IN CABLE TRAYS Km 7.6 6 Km INSTALLATION 600V CABLE MANOCONDUCTOR #3 + 1, 2 AWG 0.3 4 INSTALLATION GROUNDING SYSTEM CABLE 1/0 Km 2.5 M (linear) 3 INSTALLATION & ERECTION CABLE TRAYS 3,598.0 5 INSTALLATION OF CONDIUT & ACCESSORIES M (linear) 2,600.0 MOVEMENT AND INSTALLATION OF ELECTRIC EQUIPMENT: INCLUDING A LARGE GROUP OF DIFFERENT EQUIPMENTSUCH AS CURRENT TRANSFORMERS, POWER TRANSFORMERS, VOLTAGE TRANSFORMERS, ISOLATORS, HOUSINGS AND CABINETS, INSTRUMENT PANELS, CONTROL PANELS, SWITCHES, CIRCUIT BREAKERS, ETC., ECT., ETC., THE INDIVIDUAL WEIGHTS OF THIS EQUIPMENT WAS NOT AVAILABLE. 6