October 1990 Aachen Carlo Rubbia and Giorgio Brianti reported on the possibility to build in the LEP tunnel a 16 TeV p-p machine with 1034 luminosity. • The final design of 14 TeV LHC was approved by CERN Council in December 1994 • The Construction was started in November 2000 I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
October 1990 Aachen Michel Della Negra with UA1 colleagues Karsten Eggert and Martti Pimiä proposed concept of LHC Experiment based on super conducting solenoid with a strong magnetic field “Compact Muon Solenoid”. I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
March 1992 Evian • The main Concept of the CMS Detector shown in Expression of Interest in Evian, 1992 I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
1 October 1992 • CMS Letter of Intent • CERN/LHCC 92-3 • The design goals of CMS were defined as follows: • 1) a very good and redundant muon system, • 2) the best possible electromagnetic calorimeter (ECAL) consistent with 1), • 3) a high quality central tracking to achieve 1) and 2), • 4) a hermetic hadron calorimeter • 5) a financially affordable detector. • The design of CMS was based on leading detector technologies developed by CMS members I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
27 September 1994 Dubna • Formally RDMS was established 27 September 1994 in Dubna I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
December 1994 • Approval of the CMS Technical Proposal by CERN Council. I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
October 1995 • Session of the Scientific Policy Committee of Russian National Program of Fundamental Nuclear Physics, Arzamas-16, Sarov I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
December 1995 RDMS CMS Project CMS Document 96-85, 1995 I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
15 March 1996 • Interim MoU CMS RRB-D 96-6 I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
22 May 1996 • Decree of RF Government on Annual Funding for 10 years starting from 1997, №818-p I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
14 June 1996 • Protocol RF – CERN on participation in LHC Project I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
14 April 1997 • Protocol JINR – CERN on participation in LHC Project I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
29 April 1998 • MoU, CMS Document 1998-053 on CMS Construction I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
2008 End of CMS Construction Total RDMS Contribution for Construction of the CMS Detector, according to the MoU and CERN-RF Protocol MoU RDMS RF: 12,047 kCHF MoU RDMS DMS: 6,794.6 kCHF Cost-to-Completion: 2,211.5 kCHF In-kind 1,500 crystals 1,657 kCHF RDMS Grant Total 22,710.1 kCHF I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
30 March 2010 • LHC and CMS Start-up at 7 TeV I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
4 July 2012 • Higgs Boson discovery I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
July 2013 I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
March 2013 • End of Run1 • Beginning of CMS Phase 1 Upgrade • RDMS responsibilities are defined in Agreement between RDMS and CMS management on 25 October 2013 I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
Agreement on RDMS Responsibilities I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
Agreement on RDMS Responsibilities I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
March 2015 • Expected Run 2 CMS Start-up • at 13 TeVand designed Luminosity I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
Physics Future Shutdown Beam commissioning Technical stop LS2 starting in 2018 (July) => 18 months + 3 months BC LS3 LHC: starting in 2023 => 30 months + 3 months BC Injectors: in 2024 => 13 months + 3 months BC (Extended) Year End Technical Stop: (E)YETS 30 fb-1 YETS EYETS YETS YETS LS 2 Run 2 Run 3 Run 2 LS 2 Run 3 PHASE 1 YETS LS 3 Run 4 LS 3 Run 4 YETS 300 fb-1 PHASE 2 LS 4 Run 5 LS 5 LS 4 Run 5 LS 5 3’000 fb-1 I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
Main Objectives for Future • Study of the Brout-Engelert-Higgs mechanism is still a main focus • Search for Supper Symmetry signals • CMS Phase 2 Upgrade at HL-LHC • I would wish to all of us a success ! I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014
Conference Sessions today • The overview of CMS physics results in Run 1 • CMS physics plan for Run 2. • CMS Upgrade Phase 1 for designed energy and luminosity with participation of RDMS. I.Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7August, 2014