1 / 6

Distributed Dynamic Diversity Databases for Life

4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal. Distributed Dynamic Diversity Databases for Life. WP3 Strenghtening the GSD Network: A Virtual Community. Day 2 - General Meeting. WP3 Description of work.

Download Presentation

Distributed Dynamic Diversity Databases for Life

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal Distributed Dynamic Diversity Databases for Life WP3 Strenghtening the GSD Network: A Virtual Community Day 2 - General Meeting

  2. WP3 Description of work To facilitate structured information exchange through an elaborated information synthesis and by e-dessimination for new services Task 3.1: Survey to assess, to peer-review and to certificate each GSD Task 3.2: Evaluate and report on standards, best practices, new fields, … Task 3.3: Consultation with each GSD choosing the pilot projects Task 3.4: Two two-month Pilot projects per GSD database Task 3.5: New e-2 system wrapper for few selected GSD databases 4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal

  3. Task 3.1: Survey to assess, to peer-review and to certificate each GSD - data - wrapper - formal membership of the CoL programme - GSD metadata M.11 March 2010 WP3 Progress report (1) • Task 3.1: Survey to assess, to peer-review and to certificate each GSD • Questionnaire prepared and sent to all GSD on November 18th (link with PESI) • Several reminders by DO & TB, last on the January 5th • Still missing some of them, but survey done by DO. Survey & results tomorrow • Wrapper survey (Viktor Didziulis) • Membership (Rebecca Mann) • GSD metadata - agreed to delay this task for 6 months (WP6) 4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal

  4. WP3 Progress report (2) Task 3.2: Evaluate and report with GSD and nomenclators custodians, editorial services staff (WP5) for: - changes to the data standards for existing fields (if any) - changes to the Sp2000 Best Practices document (if any) - possible extensions to the bio-data fields (requests from the Services team) - possible internal services (name-alerts, user comment service, cross-checking with regional hubs, other lists, unassigned name batches) M.11 March 2010 • Task 3.2: Evaluate and report on standards, best practices, new fields, … • Report tomorrow following questionnaire results: • Needs of improving definitions of fields (accepted and provisional names, LTS) • Agreement to add mandatory or optional new fields • (distribution, taxon LSD use, fossils, known habitats, subgenus rank, associated organisms, reference to nomenclators via LSID // hybrids, conservation status, size) • Analysis of implication of integration of services (to be done) • Deliverables: Best practices, Standard dataset, Survey report and subsequent pilot projects documents in March 4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal

  5. Task 3.3: - explaining, agreeing and establishing priorities for the pilot project to be undertaken, eventually to provide additional training days M.12 WP3 Progress report (3) • Task 3.3: Consultation with each GSD choosing the pilot projects - Establishing priorities: synonymies, distribution, references, common names LTS / wrappers - Agreement done day1 of 2nd general project meeting - Few GSDs missing 4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal

  6. Task 3.4: Two two-month Pilot projects per GSD database: - for partially compliant GSds to take a step up the compliant ladder (add fields or best practices) - for new GSD to install and test wrapper and delivery process - for installing and test fill the new bio-data fields from WP8 - for pilot participation in one the new internal services of the programme Task 3.5: Two two-month Pilot project for selected GSD database: - for test and install new e-2 system wrapper (at the end of the project) M.24 M 36 WP3 Progress report (4) 4D4Life 2nd General Meeting, 15-18 february 2010, Faro, Portugal