250 likes | 406 Views
Integrating Corporate Strategy and Maintenance Execution Vetasi South Africa Maximo Day 2012. Jaco White: 19 November 2012. Agenda. Hulamin in a Nutshell; The Aluminium Value Chain; Integrated Manufacturing Approach (IMA); Hulamin’s historical View of Asset care; Asset Management Strategy;
E N D
Integrating Corporate Strategy and Maintenance ExecutionVetasi South Africa Maximo Day 2012 Jaco White: 19 November 2012
Agenda Hulamin in a Nutshell; The Aluminium Value Chain; Integrated Manufacturing Approach (IMA); Hulamin’s historical View of Asset care; Asset Management Strategy; Deployment Strategy; Successes; Challenges; Looking Ahead Questions?
The Aluminium Value Chain (in SA) BHP Billiton Hulamin Fabricators and Distributors e.g. Nampak, MacSteel, etc.
The Integrated Manufacturing Approach (IMA) • Process Control • Equipment Performance • Improvement Projects • Business Processes • Visual Management
Hulamin’s historical approach to asset care • 1990’s Strong centralised control of standards and execution; • 2000’s Complete decentralised approach with limited centralised support; • Maximo only used as procurement system; • Maintenance Plans Excel based; • Fragmented pockets of excellence. Each area doing the best with what it has. • 2006 Formation of IMA to drive business excellence which includes Equipment Performance; • 2011 Establishment of Centralised Engineering to control standards and specialist support.
Approach to formulating our maintenace strategy • Inclusive process; • Establish best practice internationally using: • Vetasi; • SMS Siemag– Germany; • OMCS – Canada; • International Standards like SMRP. • Interviews with role players within Hulamin; • PAS 55 Audit.
Core Elements of Maintenance Strategy • Know what assets we have; • Clear view on their performance against target; • Asset condition need to be visible - focus of life plan development on predictive maintenance; • Standardise maintenance strategy across same items within the business; • Use CMMS to drive work execution; • Sound Planning and Scheduling systems and routines; • Effective RCA Process; • Ensure effective reporting on equipment and management systems performance.
Manufacturing Systems – The Hulamin way Oracle (Financials Only), Legacy HR
STRATEGY RCA KPI’s CMMS Systems view of applied strategy RCA EP Strategy Development • Criticality; • Cross functional teams; • Input Process and • Equipment Info like FMEA; • Change Management; • Priority Predictive; Equipment Master data Planning and Scheduling Efficiency indicators • Inline with Strategy; • Automated reporting; • Part of continues • improvement; Feedback Execution Spares / Materials Management
STRATEGY RCA KPI’s CMMS Systems integration Maintenance Master plan and PMO strategy aligned Same Process Master Plan One System Integrated System G8D KPI’s BES Process
Maximo Planning and Scheduling • Great work visualisation • Macro PM Balancing; • Detailed W/O scheduling; • Future labour utilisation; • Some reporting functionality;
Deployment Strategy • Communicate extensively to get alignment through MDWT structures; • Sound Project management principles applied; • Upfront involvement in business processes development; • Ownership in the Mini Business Unit of execution of plan. (Central Coordination and standards setting, but meaningful / tangible support); • Clearly defined Roles, Responsibilities and Routines, with strong sense of accountability; • Artisan level visual management to facilitate; • Clear view on what we will STOP doing; • 6 Weekly Visual Felt Leadership reviewing progress against plan as well as assessing behavioural change progress; • Automated KPI generation with focus on leading indicators to drive behaviour;
Equipment life plan development • Criticality review of more than 32, 000 for Severity, Occurrence and Detection • OMCS International (Australia) involved in setting up libraries; • OEM recommendations; • IDCON manuals; • Our own and OMCS experience. • Pragma facilitating RCM studies on top 10% of critical assets; • Compliance system built to report on adherence to critical work.
Sustaining Strategy – Overall Equipment Performance • OEE = Availability (%) x Performance (%) x Quality rate (%); • Availability is the ratio of Operating Time to Planned Production Time; • (Calculated as scheduled uptime as ratio of actual uptime); • Performance is the ratio of net operating time to operating time; • (Calculated as the ratio of ideal cycle time to actual cycle time); • Quality Rate - measure of the processing waste; • (Calculated as the ratio of good pieces to total pieces against ideal). • Measured real-time by shop floor execution systems linked to equipment (BES); • Used business wide as measure of equipment performance; • 80% of all equipment utilising OEE measure.
Successes • Real top down support with commitment on VFL process; • Well chosen software to facilitate strategy; • Well integrated system; • Excellent support from application developers; • MBU buy in excellent; • Equipment and systems KPI’s; • Engen Fluid Link lubrication program.
Challenges • Part of strategy formulation is to also to decide what to stop doing; • Underestimated the complexity of integrating various applications; • Getting the message across to artisans on why it is necessary to cover all work with a work order; • Changing the mind set of engineers to focus on Systems rather than the nuts and bolts of maintenance (important v/s urgent). • 60% of effort on people
Looking Ahead • Maximo 7? • PASS 55? • TPM; • In-house Condition monitoring program; • Safety module within Maximo;