An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MERIT pre-installation review:Preliminary conclusions Fabich

  2. Follow-up:Safety Review of mercury system http://edms.cern.ch/document/754444/ Draft answer: http://cern.ch/merit/doc/HgSafetyReviewAnswer.htm Hot issues: • Item 11: LEXAN cover on sump tank and as lid • Latest documentation on used materials and procedures is currently looked at.

  3. Follow-up:Cryogenics and solenoid review https://edms.cern.ch/file/710659/1/memorandum.pdf • Item 2: User’s notice. Yet now written procedures on installation and operation of the solenoid&cryogenics have been provided. • Cryogenics part by AT/ECR • Item 5: Results of non-destructive test (x-rays of welds) • Item 8: formal answer by collaboration is required.

  4. Pre-installation review • Installation in TT2A during PS2 run with beam possible. • Personnel radiation dose plan and access procedures need to be written. • The use of PU foam is currently investigated. • Safety valves of cryostat and vacuum jacket. • Maximum operating pressure of cryostat limited to 10 bar. Resolves a lot of issues. • A lot is dependent on the surface tests at build 180: leak test (warm and cold), condensation.