An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report on the EUMETNET ASAP Presentation by Rudolf Krockauer, E-ASAP Programme Manager April 2007, Geneva, SOT-IV

  2. Contents: 1. E-ASAP fleet 2. Performance 2006 (and 2007) 3. Plans and activities 2007/2008

  3. No Ship ASAP station Route Shipping company E-ASAP and integrated national ASAPs: 1 SL Performance ASEU01 Houston – East Coast US – North Europe Maersk 2 SL Achiever ASEU02 Houston – East Coast US – North Europe Maersk 3 Endurance ASEU03 Western Mediterranean – Montreal Hapag Lloyd 4 Power ASEU04 Western Mediterranean – Montreal Hapag Lloyd 5 EWL Central America II (*) ASEU05 Western Europe – Halifax – Caribbean Thien & Heyenga 6 Atlantic Compass ASDE01 North Europe – East coast US Atlantic Container Line 7 FS Meteor ASDE02 Research vessel, no dedicated route Ministry of Technology and Research 8 SL Motivator ASDE03 Houston – East Coast US – North Europe Maersk 9 Hornbay ASDE04 North Europe - Caribbean Horn Linie 10 Mississauga Express ASGB01 Montreal – North Europe Hapag Lloyd National ASAPs: 11 Fort St. Louis ASFR1 North West Europe – French West Indies CMA CGM 12 Fort St. Pierre ASFR2 North West Europe – French West Indies CMA CGM 13 Irena/Naja/Mary/ Arina/Nuka Arctica ASDK01, ASDK02 Denmark – West coast Greenland Two units are distributed among five ships. Royal Arctic Line 14 15 Esperanza del Mar EBUQ Off Mauretania and Canary Islands Instituto Social de la Marina 16 Skogafoss V2XM Iceland – North East US Eimskip Current E-ASAP fleet 2007

  4. Contents: 1. E-ASAP fleet 2. Performance 2006 (and 2007) 3. Plans and activities 2007/2008

  5. Distribution of soundings 2006 (Jan-Dec)

  6. * Mean average ** Median average

  7. Availability key figures: • 5150 soundings set as target for 2006. • 5153 launches according to log books. • 4300 soundings received on the GTS. • 83% average efficiency. • Reduced soundings since Oct 06 due to - Closure of receiving station Goonhilly, - Helium shortage.

  8. Comparison 200g vs 350g balloons: => 30% more helium is needed to achieve 5% more height • Quality key figures: • Mean timeliness < HH+100 (new timeliness target). • Median burst heights < 50 hP for all units. • Median burst heights slightly better for 350g than 200 g balloons, but no difference in achieving the EUCOS targets (90% 100 hPa, 75% 50 hPa).

  9. Performance 2007 Received soundings 01/Feb – 12/Mar 2007

  10. Performance 2007 • Key figures and occurrences: • Code 41 transmissions changed from Goonhilly to Aussaguel. • KNMI is working on a solution to accept sounding data via station Burum. • Low performance in Jan/Feb due to storm season (e. g. 8 in 19 launches from ASEU01 crashed at launch in Feb). • Return to ususal schedule since Feb (soundings at 00, 12, and 18 UTC on dedicated ships) despite helium supply problems. • Completion of replacements of station PCs by semi rugged notebooks on E-ASAP ships.

  11. Contents: 1. E-ASAP fleet 2. Performance 2006 (and 2007) 3. Plans and activities 2007/2008

  12. Plans and activities: • Establish a wider network of supporting PMOs • Improving the satellite communication - Decoupling sounding and transmission systems, - Direct e-mail transmission to DWD and forwarding to GTS. • IPY: - additional soundings for GFDex campaign 19/Feb – 10/Mar, - further support, if requested • EURORISK: - providing facilities for position tracking for targeted soundings. • Assess options for high resolution BUFR data - TEMP: 2 KB - Edited 5sec BUFR: 65 KB

  13. Summary: • 16 units delivered 4300 sounding data (5153 launches) in 2006 • Average timeliness < HH+60 • Average burst height < 50 hPa • Decoupling of transmission and sounding • Changeover to e-mail transmission instead of SAC 41