1 / 14

Project Scope EMR Update 4/15/203

Project Scope EMR Update 4/15/203. Meaningful Use is a thread weaving throughout the project scope. System Build Interfaces Product Development Workflow Process Development eClinicalMessenger Health Portal Build Migration Enterprise Business Optimizer Training.

kuper
Download Presentation

Project Scope EMR Update 4/15/203

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Scope EMR Update4/15/203 Meaningful Use is a thread weaving throughout the project scope • System Build • Interfaces • Product Development • Workflow Process Development • eClinicalMessenger • Health Portal Build • Migration • Enterprise Business Optimizer • Training

  2. System Build % complete • Administration 90% • Front Office 54% • Billing 52% • EMR Therapy 10% • EMR Clinical 17% Implementation Documents\OOCE System Build CheckList.xlsx Implementation Documents\OOCE Employee Roster_02152013.xlsx Implementation Documents\System Build_Security Settings_Roles.xlsx

  3. Interfaces • Transportal • Interface completed • Testing in progress • PACS Synapse • Interface development 70% completed • Testing to follow • Ohio Health • Ohio Health capability is in place as of this month • Discovery call this week • Paging • Therapy item • New interface process for eCW • Alpha testing underway at eCW

  4. Product Development • Patient Panel (Fitz Panel) • Development 90% complete • Prototype 2nd demo pending • Multiple copay fields • Completed • Therapy Superbill • Development completed • Adding to test environment pending • Therex Log • Development in progress • Prototype 1st demo pending

  5. Workflow Process Development • 41 Clinical Workflows • Completed 7% • In Progress 27% • To Develop 66% • Scheduling and Front Office (9 wf) • 77% in progress • 23% to develop • Mid Office (21 wf) Clinical Secretary/PCC/PA-C/MD/DI/HIM • 14% completed • 19% in progress • 67% to develop • Billing (11 wf) • 100% Workflows to develop • Implementation Documents\OOCE Workflows List.xlsx • Implementation Documents\Workflow notes\DME Current Workflow_Open with Word_03062013.docx • X:\EMR_Project\Implementation Documents\Workflow notes\internal therapy referral 3202013.pdf

  6. Workflow Process Development • 19 Therapy Workflows • In Progress 47% • Completed 21% • To Develop 32% • Scheduling and Front Office (11 wf) • 36% completed • 64% in progress • Mid Office (8 wf) aide/PTA/Therapists etc • 25% in progress • 75% to develop

  7. eClinicalMessenger Build • Appointment reminders integrated into eCW • Messages similar to existing with Televox • Implementation Documents\Messenger Visit Type worksheet_OTI_12122012.xlsx

  8. Health Portal Build

  9. Migration • Centricity • Test migration completed and verified in an eCW test environment • TouchChart • Test migration of 50 patients completed • Several mapping adjustments completed, one pending • Form documents in touch chart require conversion to tiff format- test of 50 patients in process • Migration Strategy • In Development

  10. EBO Enterprise Business Optimizer (Analytics) • Underlying software: IBM Cognos business intelligence application • Initial overview completed w/ Directors and Finance admin • Standard reports 400 + • Training before go-live • Query Studio • Add hoc drop/drag report generation • Training before go-live • Reports Studio • 90,000 fields • 4000 metadata (clinical) elements • Calculation • Multiple associations of metadata • Training 4-6 weeks after go-live

  11. Training • Commence 2 ½ to 3 months before go-live • All build, interface, development, workflow, training workbooks must be completed and tested prior to start of training

  12. EMR Café The view from my desk

More Related