An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EDW Project Scopeand UpdateFebruary 5, 2007 http://nodal.ercot.com 1

  2. Topics • Overview • Process • EDW Scope and Progress • Questions/Comments http://nodal.ercot.com 2

  3. MIS – High Level Protocol/Other Binding Documents EDW/ CDW Source Systems Current Day Data Mkt Info System UI API Screen Display Data Extract Formatted Report Data Extract User System Manual http://nodal.ercot.com 3

  4. EDW – Where We Fit Notifications Extracts EDW Protocols Nodal/Zonal Nodal Data Services Master List Business/Market Reqs Market Guides Reports Current Day Reports Replication Data Marts Alerts Lodestar Parser Source System Reports DMT Market Documentation http://nodal.ercot.com 4

  5. The Process We Follow Step 1: Ensure protocol compliance and traceability (NDSML) Step 2: Define scope of reports and extracts for EDW and CDR (NDSML) Step 3: Prioritize reports and extracts (EDS Releases) Step 4: Develop business requirements for each report or extract (Requirements template) Step 5: Develop report or extract Step 6: Review with business for comments Step 7: Post to Nodal Readiness Center for MP review Step 8: Revise as needed to support comments, changes in source systems, and data availability http://nodal.ercot.com 5

  6. EDW Summary Releases • EDW 1A – 1/31/08 (EDW DEV) • Status: Completed as DRAFT and reviewed by business owners • RSS not in place; missing SE data in EDS, PI data sporadic • DRAFT State Estimator Reports • Voltage Residuals vs. Telemetry for Critical Buses (NP3-582-ER) • Electrical Buses not meeting Telemetry Accuracy Requirements (NP3-363-ER) • MW Residuals vs. RTCA Base Case for Critical Transmission Elements (NP3-579-ER) • MW Residuals vs. Telemetry for Major Transmission Elements (NP3-581-ER) • MW Residuals vs. Telemetry for Critical Transmission Elements (NP3-580-ER) • State Estimator Convergence (NP3-578-ER) • DRAFT State Estimator Extract • State Estimator Statistics Extract – SESTATS_EXTRACT • CRR Replication: CRR FAT to EDW DEV • CMM Replication from CMM FAT to EDW DEV • DRAFT reports posted to Readiness Center: • http://nodal.ercot.com/readiness/reports/index.html http://nodal.ercot.com 6

  7. EDW Summary Releases • EDW 1B – 3/14/08 (EDW FAT) • Status: Started on 1/28/08; on schedule • Dependent on RSS boxes available to EDW by 2/7/08 • State Estimator Reports • Voltage Residuals vs. Telemetry for Critical Buses • MW Residuals vs. RTCA Base Case for Critical Transmission Elements • MW Residuals vs. Telemetry for Major Transmission Elements • MW Residuals vs. Telemetry for Critical Transmission Elements • State Estimator Convergence • State Estimator: Extract • State Estimator Statistics Extract – SESTATS_EXTRACT • Telemetry Reports • Critical Points Violating Quarterly Availability Standards (S8) • ICCP Link Availability Statistics (S8) • Monthly Market Participant Real Time Availability Statistics (S8) • QSE ICCP Link Availability* (S8) • TSP ICCP Link Availability* (S8) • Quarterly Point Availability Statistics (S8) • MMS Reports • Report: Security Violations & Binding Transmission Constraints • Replication • Outage Scheduler Replication: OS FAT to EDW DEV (Source needed by 2/11) • CRR Replication: CRR EDS to EDW FAT (CRR EDS needed by 2/11) • CMM Replication: CMM ITEST to EDW FAT (CMM ITEST needed by 2/15) • MMS Replication: MMS FAT to EDW DEV • EMS Replication: EMS EDW to EDW PTEST * Assumes MP distinction can be made based on EMS data from SCADA module http://nodal.ercot.com 7

  8. EDW Summary Releases • EDW 1C – 3/31/08 • Dimensional Maintenance Tool (DMT) in EDW FAT • ICCP Link Outage Scheduler • Critical/Significant Points Mgmt • Historical Congestion Elements • Critical Buses • Major Transmission Elements • Replication • Siebel replication: Siebel ITEST to EDW DEV • Additional EMS Reports • Prevention of Temperature Rating Adjustment (NP3-430-ER) • Resource Capacity Factors (NP4-528-ER) • Changes To RUC Committed Resources (NP5-108-ER) • Dynamic Rating Report (NP6-216-ER) • Total Amount of Regulation Service (NP6-654-ER) • Actual Resource Output (SYS-12) • Commercially Significant Constraints – Daily (SYS-128) http://nodal.ercot.com 8

  9. EDW Summary Releases • EDW 2A – 5/14/08 (EDW DEV) • Status: Business requirements due 3/1/08 • COMS Shadow Settlements Extracts • Day Ahead Market Settlements & Billing Extract (NP12 -177) • Day Ahead Consolidated Operating day Extract (NP12-743 ) • Real Time Market Consolidated Operating Day Extract (NP12 – 747) • Real Time Market Operating Day Extract (NP12 – 749) • Public Reference Data Extract (ZP12 – 465) • Settlement Input Data Extract (NP12 – 753) • Extract Scheduler • Lodestar Parser • Lodestar Replication • EDW 2B – 6/14/08 (EDW ITEST) • Same as in DEV above http://nodal.ercot.com 9

  10. EDW Summary Releases • EDW 3.0 – 8/31/08 (ITEST) • Status: Not started • All Non-Shadow Settlements Extracts, Reports & Web Services Reports • Extracts - COMS • CRR Balancing Account Extract • Late Fee Extract (combining NP9 – 308 and NP9 – 565) • ESI ID Service History & Usage Extract (ZP12 – 245, 246, 247) • Recorder Extract (ZP11 – 489) • Resource Identifier Extract (ZP11 – 532, 535) • Market Participant Dispute Extract ( ZP9 – 515) • Settlement Calendar Extract (NP9 – 598) • Settlement Input Data Extract (NP12 – 753) • CRR Auction Revenue Distribution (CARD) Extract (NP9 - 97) • Reports – Outage Scheduler • Resource Outage Statistics on Planned vs. Actual • Transmission Outage Statistics on Planned vs. Actual • Web Services • Provide all ESI ID extract records (COMS - 438) • Provide data aggregation records (COMS - 440) • Provide ESI ID extract records for logical keys (COMS - 442) • Provide ESI IDs where IDR usage data not loaded for a trade date (COMS - 444) • Provide IDR usage data for a trade date (COMS - 447) • Provide ESIID account records (COMS 441) • Provide public data extract (COMS 452) • Provide CMZONE assignments for a trade date (COMS - 439) • Extract Scheduler http://nodal.ercot.com 10

  11. EDW Summary Releases • EDW 4: 8/31/08 (tentative) • Status: Not started, pending NPRR review and resolution of when/what needed • EDW MMS Section 8 • COP Report (S8) • RUC Report (S8) • EDW OS Reports Section 8 • Outage Schedule Report (S8) • Outage Scheduler Metrics (S8) • Other Section 8 Reports • CPS1, CPS2, DCS Reports (NP8-143) • Disturbance Performance Report (NP8-212) • Non-Spin Performance Report (NP8-383) • PDC Unit Trip Report (NP8-418) • Provided Regulation (NP8-501) • Historic Non-Spin Availability (NP8-504) • Voltage and Reactive Control Performance Metrics (4 reports) (NP8-511) • Blocked Governor Response Report (NP8-514) • Controllable Load Qualification Test (NP8-517) • Responsive Reserve Performance Report (NP8-541) • Responsive Reserve Availability Report (NP8-542) • Unit Performance Report (NP8-691) http://nodal.ercot.com 11