1 / 7

UPCOMING REQUESTS FOR PROPOSALS

UPCOMING REQUESTS FOR PROPOSALS. Larry Tunnell, PE, PG Chief Engineer. Utilities Automation Plan Update Phase: Project Initiation (TBD) Cost: $800,000. Purpose Update master plan for pump station, WSF, WRF and AMR automation. Components Master Plan Central vs Remote SCADA

kuster
Download Presentation

UPCOMING REQUESTS FOR PROPOSALS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UPCOMING REQUESTS FOR PROPOSALS Larry Tunnell, PE, PG Chief Engineer

  2. Utilities Automation Plan UpdatePhase: Project Initiation (TBD)Cost: $800,000 • Purpose • Update master plan for pump station, WSF, WRF and AMR automation. • Components • Master Plan • Central vs Remote SCADA • Cost Effective Improvements • Energy & Chemical Optimization • Staffing & Knowledge Capture • Standardization on Design, Equipment, Software, Procedure, and Process • Enterprise Reporting • RFP Fall 2011 All Districts

  3. Water Conserv II Reclaimed Water Booster Pump StationPhase: PlanningCost: $5,000,000 PROPOSED BPS N • 54-inch reclaimed water transmission main • Boost capacity from 75 MGD to over 90 MGD • Wet weather events • Needed by 2015 • Negotiating cost-sharing agreement with City • RFP Fall 2011 District 1 S16-T23-R27

  4. Southwest Water Reclamation FacilityPhase: Land Acquisition and PlanningCost: $50,000,000 (Phase 1 Construction) N • 50-acre site at Water Conserv II Rib Site 6 • Facilities Plan to be Updated • 5 MGD Phase 1 • BNR for 3 mg/l total nitrogen • Evaluating option as membrane bioreactor facility • Updated flow projections • RFP Fall 2011 District 1 S16-T23-R27

  5. SSA/ESA WM/RWM-Landstar Blvd. to Wewahootee Rd.Phase: Real Estate Acquisition/RFPCost: $15,000,000 Water; $8,500,000 Reclaimed Water WEWAHOOTEE RD. I - 4 MOSS PARK RD. NARCOOSSEE RD. BOGGY CREEK RD. LANDSTAR BLVD. SR 417 N • Obtaining easements • Approximately 10.75 miles 36-inch water main and 20-inch reclaimed water main • RFP Spring 2012 District 4 S31-T23-R29

  6. Lee Vista Blvd. to Innovation Place WM and FMPhase: Planning / RFP Cost: $8,300,000 LEE VISTA BLVD O.C. LANDFILL LEE VISTA BLVD SR 528 INNOVATION PLACE PD MOSS PARK ROAD N • 24,200 feet 30-inch potable water main • 25,600 feet 30-inch forcemain • RFP Fall 2011 District 4 S20-T23-R31

  7. Innovation Place PD UtilitiesPhase: Planning / RFPCost: $10,000,000 Innovation Place PD Potable Water Main Existing Reclaimed Water Main Existing Wastewater Forcemain Existing LEE VISTA BLVD SR 528 SR 417 INNOVATION WAY DOWDEN RD N MOSS PARK RD • 17,000 feet of water main • 12,800 feet of forcemain • 15,600 feet of reclaimed • Wastewater pump station • RFP Spring 2012 District 4 S20-T23-R31

More Related