An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test Plan for PMD Testing of a WDM Receiver Henry Yaffe, Principal January 2004

  2. Recommended Test Program • Process • Establish test procedure (automation recommended) • Schedule time in front of systems • Experiments: • Measure bare receiver • Use NRT PMD Source to map to Joint Probability Distribution Function • Analyze data - Calculate Total Outage Probability for different mean span PMDs. • Addendum • If desired, add more impairments (CD, non-linearities) and re-measure www.NewRidgeTech.com

  3. 10-6 BER vs. OSNR Back-to-back 40 ps PMDC 60 ps PMDC Relative OSNR Penalties 80 ps PMDC 60 ps uncompensated 10-12 Back to Back BER Recommended: 10-12 BER as limit (else, each test is too time-consuming) OSNR Test Basis: System Margin (OSNR) as Performance Benchmark www.NewRidgeTech.com

  4. 55/2297 40/2263 70/2051 80/1587 55/1598 75/1488 40/1386 75/1183 20/1183 55/1097 40/894 20/566 40/0 80/0 20/0 60/0 0/0 Recommended Tests to Acquire OSNR Performance for 25 Ps PMD Ex.: 17 states can adequately cover the 25psec (25%) contour www.NewRidgeTech.com

  5. Acquiring the data • Test basis: • Set & maintain all system parameters • Vary OSNR for a given PMD state & measure BER • Characterization process: • Set PMD state • Set OSNR • Set RX power • Record: payload, B3 BERs, error counts, elapsed time, OSNR, and RX power every 30 seconds • Continue recording for >5 min and <30 min (or 10 hits) • Increment OSNR, repeat www.NewRidgeTech.com

  6. 25 km SMF-28 PMDE EDFA Tx Attenuators Polarization scramblers BERT OSA 10 % Tunable 10* 9 11 12 7 6 2 3* 5 8 1 90/10 PMDC* Rx 90/10 Filter 10 % Power meter Test Stand Required for PMD Testing • Automated BER v OSNR at fixed RX power • Allows efficient measurement of many PMD states • Decreases data acquisition time by 3-4x • * Polarization scrambler 3 is not needed if no optical PMDC is used www.NewRidgeTech.com

  7. Test Setup – Equipment Key • Launch Polarization Scrambler – ensures no launch at SOP, which could create artificially high-quality eye • PMDE – controllable PMD source • PMDE Output Polarization Scrambler (optional, only use with 10) – randomly varies SOP to provide “speed” input • Fiber spool – source of “residual” chromatic dispersion (appropriate for chirped systems) • EDFA input attenuator – ASE noise control (OSNR) • EDFA – ASE source • EDFA output attenuator – power control • OSA – OSNR measurement • DWDM Filter – models DWDM effects • PMDC (optional) – compensates for PMD • Power meter – power measurement to maintain constant Rx dBm • BERT – measure BER as performance output www.NewRidgeTech.com

  8. Test Conditions • To establish consistent and verifiable test results • Testing should be conducted PMD as the only impairment • A benchmark system operating level should be set and maintained (Rx power, etc.) • For a given WDM system: • Maintain a constant received power (dBm) level • Turn FEC off (or measure pre-FEC) • Turn SBS Suppression off (if used) • Maintain a fixed (preferably zero, to avoid confusing effects) level of residual chromatic dispersion at the RCVR www.NewRidgeTech.com

  9. Benefits of Automation Can Rapidly Acquire Data to Model Real-world Performance • For network-realistic PMDC characterization: • Reasonable sampling of PMD states is required • Try to define points where DGD & SOPMD performance degrades • Probability of reaching any those states is relevant to system performance • Testing each data point is time-consuming: • Need ~1hr for good statistics at 10-12 BER • Measure for minimum of 5-10 minutes for full SOP coverage • BER v OSNR curves (3-4 points) takes 1 to 2 hours • Automation improves confidence of characterization • Can characterize 10 to 20 PMD states in 24 hours with automation • Compare to ~ 5 to 8 manually per 8 hour shift • OSA, power meter, 2 attenuators, BERT, PMDE are GPIB interfaced • PMD, test time, polling time, OSNRs, and RX powers set by user www.NewRidgeTech.com