An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dispatch Reliability StatusEMBRAER 170/175 March 2006

  2. Contents • Fleet Summary • Dispatch Reliability • Operational Performance Project • Conclusion

  3. Contents • Fleet Summary • Dispatch Reliability • Operational Performance Project • Conclusion

  4. Embraer 170/175 - Aircraft In Service Airline EIS A/C in Service Acc. FH Lot Polish March 17, 2004 10 37,353 US Airways April 04, 2004 12 54,182 19,263 Alitalia April 26, 2004 6 127,226 Republic Holdings October 22, 2004 54 Cirrus Airlines January 15, 2005 1 1,824 12,455 AIR CANADA July 27, 2005 15 3 Hong Kong Express September 08, 2005 2,916 FINNAIR October 01, 2005 5 3,189 Paramount October 19, 2005 1 2,089 Saudi Arabian Airlines February 01, 2006 4 905 E 170/175 March 17, 2004 111 261,402 Source: Airlines (as of Mar 17th 2006) EI 19/JJan/06

  5. Embraer 170/175 - Statistics

  6. Contents • Fleet Summary • Dispatch Reliability • Operational Performance Project • Conclusion

  7. Embraer 170/175 Dispatch Reliability Worldwide Europe (*) Monthly. Ref. date: Mar 15th, 2006

  8. Contents • Fleet Summary • Dispatch Reliability Diagnosis • Operational Performance Project • Conclusion

  9. Operational Performance Project • Objective: • Improvement of Embraer 170/190 fleet and customer operational performance • Organization: • Creation of senior teams in different areas to address Embraer 170/190 operational issues • Assignment of dedicated in-house customer focal points at Embraer to address each Customer’s needs (ECAMs) • Embraer high level management deep involvement

  10. Reliability Diagnosis Spare Parts Availability Product Technical Issues Specific Operators Environment

  11. Operational Performance Project • Expected Short Term Results: • Increase of Embraer 170/190 dispatch reliability • Improve lead times for product correction (solution / implementation) • Guarantee effective (basic and peculiarities) training for customer operational personnel • Assure spare parts availability (Embraer / Supplier) for the Embraer 170/190 operation without interruptions • Closer and accurate communication between Embraer and Customer in all organization levels • Focus on each operator with solutions and actions tailored to its particular needs

  12. E170/175 Dispatch Reliability Status 2005 2006 (as of Mar 15th, 2006)

  13. E170/175 Dispatch Reliability Status 2006 2005 (as of Mar 15th, 2006)

  14. Dispatch Reliability Status (as of Mar 23th, 2006)

  15. Dispatch Reliability Status (as of Mar 23th, 2006)

  16. Contents • Operational Summary • Dispatch Reliability Diagnosis • Improvement Actions • Conclusion

  17. Conclusion EMBRAER acknowledges that the Embraer 170/175 are performing below expectations. However: • WW Fleet Schedule Reliability has been improving continuously. • Completion Rate is already high, on par with industry standards. • The solutions already provided have been effective, quick and with reduced impact to airline’s operation. • Solution packages already being developed by EMBRAER will be available in the coming months, increasing Schedule Reliability to required levels. • Spare Parts availability issues are identified and being corrected.