FSCT Summary. ME – Craig Charlton Add Pull up PCD401Z7001 to Strap Installs, reference 126 soi’s *JB5402 for PCD Coordinate with Manufacturing & ( Add to SOI’s?) to perform the remaining gap checks defined in the attachment ME to Support review of SOI’s: (review with FSCT team Monday 5/13)

kynton
Download Presentation

FSCT Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FSCT Summary ME – Craig Charlton • Add Pull up PCD401Z7001 to Strap Installs, reference 126 soi’s *JB5402 for PCD • Coordinate with Manufacturing & ( Add to SOI’s?) to perform the remaining gap checks defined in the attachment • ME to Support review of SOI’s: (review with FSCT team Monday 5/13) • FSCT cutting SOI’s (CAFFGAFJB9011 & CAFFGAFJB9013) – Revised cut SOI to reflect plan on slide 9 • Rotation SOI – need to reference engineering requirements • Disposal SOI CAFFGAFJB9012 & CAFFGAFJB9015 do not address what to do after PPV remnants have been moved away from CS • Shipping feet installation SOI - Authorization # PDTIR404Z7000-200 – • FSCT Cover with shipping tarp – JOBS NEED TO BE WRITTEN TO: TUI_XMEPDTRL473Z5000 • Need to add tubing install • FSCT place on truck – JOBS NEED TO BE WRITTEN TO: TUI_XMEPDTRL473Z5000 • Fin Deck Fittings parts – part in house – COMPLETE • SOI#: CAFFGAFJB2601/2603 available • PN:483Z7502-1,2,3,4,5,6 • PMIT Fittings 3ME485Z0110-1 NC 2470278 sent to LE 5/14 • Need SOI #:??? Occurs in Control Station 292 to install APB

  2. FSCT Summary ME – Craig Charlton • Barrel cutting - ME Review with team • Use attached cut plan • CAFFGAFJB9011 – 47 Section • CAFFGAFJB9013 – 48 Section • Barrel PPV parts disposal - ME Review with team • CAFFGAFJB9012 - 47 Section • CAFFGAFJB9015 - 48 Section • FSCT shipping feet installation - ME Review with team • SOI#: CAFFGAFJB2601/2603 • Need SOI for Shipping feet install – Shipping feet part numberPDTIR404Z7000-200 • FSCT rotation - ME Review with team • CAFFGAFJB9016 • Reference COORDINATION SHEET -787FwdAft-12-081-RevB “Section 47/48 Join Full-Scale Component Test (FSCT) Manipulator Fitting Lift Angle Limitations” • FSCT Painting - ME Review with team • CAFFGABB1016 – PRIME AND TOP COAT • FSCT cover with Tarp – ME Review with team • NEED SOI - Craig Charlton • FSCT place on truck - ME Review with team • NEED SOI - Craig Charlton

  3. FSCT Summary Tooling • CAM Shoot Painted cut line – LH door in work – Ben Dees • Tool use instruction for FSCT “TUI_XMEPDTRL473Z5000” revised – Henry Macias • Rotation Fitting shims ECD 5/17, need date relief to 5/17 – COMPLETE Operations • Missing Fin Deck fitting 483Z7502-5 – COMPLETE • Back shop commitment plan to complete Open SOI’s – Cell Managers • The FSCT requires the fittings shown in the attached ppt to be installed.  Holes are in the dome and they do not require any additional holes. These are defined in PDT485Z0110-625. • SRR2466706-01-A (Upper 6 seal fittings) is released and attached to CAFFGAFJB5390 • SRR2466767-01-A (Lower 8 seal fittings) is released and attached to CAFFGAFJB5391 • APB fitting install • CDS #: 594427 ETAC # CS01398983 • SRR2466706-01-A (Upper 6 seal fittings) is released and attached to CAFFGAFJB5390 • SRR2466767-01-A (Lower 8 seal fittings) is released and attached to CAFFGAFJB5391 • Counter Sink holes • Section 47 EPD 2426379 • Section 48 EPD 2359214

  4. FSCT Summary • Paint Under Rotation fittings (section 47) • If QA re-opened the SOI so MT can paint the fitting then no additional planning or tag is required.  The MT will use the baseline SOI to complete the work. CAFFGAFBB1010 (baseline work) • UV damage detection - ME Review with team/Quality • Verify section 47 cut line location - Prime tooling • STN 1794 • FSCT rotation fitting install – ME Review with team/tooling • Need Shim’s - Part on dock at BSC • 1.)  Shim is for PDT404Z7000-300 Shim Definition 01 thru Shim Definition 05 • 2.)  Parts to be made at FAST Coordinate with John Madison (ME) • CAFFGAFBB1011 - LH • CAFFGAFBB1012 - RH

  5. 14 Fittings as shown need to be installed on the dome assy. PDT485Z0110-625 defines these installations. PDT485Z0110-62 was ordered, built and received by PAG. APB Fitting installation

  6. Straps to Crane Sec. 47 Cut Attach 2 lifting straps from crane around Sec. 47 and apply tension to provide lifting and side support to barrel. 2. Attach lifting straps to Rotation Fittings on FSCT with crane and remove slack from straps. Do NOT lift the FSCT until after both 47 and 48 cuts are complete. 3. Locate line for stringer cuts on interior of barrel 4. Cut stringers only to prevent damage to FSCT stringers. 5. Provide vertical support to LH and RH door openings. 6. Cut barrel exterior at Sec. 47 cut line FS 1793.85 to FS 1794 from top center.

  7. 7. Add ratchet strap (1 each side) to Sec. 48 to prevent sliding after Sec. 47 is cut and to provide means of separating Sec. 48 from FSCT later.

  8. Sec. 48 Cut 8. Cut Sec. 48 on final trim line where possible and move aft approximately 6 inches. (Manufacturing)

  9. 9. Remove Sec. 47 by raising FSCT and 48 enough to allow Sec. 47 Cradle to clear FSCT on removal. 10. Install Shipping feet. (Manufacturing) 11. Remove FSCT barrel. (Crane Crew)

  10. = 12. Rotate FSCT and place on shipping container. (Crane Crew)

  11. 13. Complete Trimming operation on Sec 48 to trim line. (Manufacturing) 14. Paint (Manufacturing) 15. Add Tarp and prepare for shipping per TUI_XMEPDTRL473Z5000-100_A or latest Rev.

  12. 16. Remove Sec. 48 Remainder on cradle.