1 / 17

JTLS Direct Link To MUSE

JTLS Direct Link To MUSE . Ellen F Roland JTLS Development Team Leader. JTLS Program Vision.

kyoko
Download Presentation

JTLS Direct Link To MUSE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JTLS Direct Link To MUSE Ellen F Roland JTLS Development Team Leader

  2. JTLS Program Vision • Use the Joint Theater Level Simulation to meet Joint, Coalition and Service training requirements while maintaining our M&S support and partnership with U.S. Allies, NATO, PfP countries and Federal Agencies to maximize our users’ return on investment through a flexible, scalable and deployable simulation. ROLANDS & ASSOCIATES Corporation

  3. First Direct Link to MUSE CEP JODA Aggregate Unit Data MUSE Bridge Detailed Naval Damage One Way Communications Different Templates • MUSE • Intel (ACE/IOS) Entity Level Data From Templates (DIS) ROLANDS & ASSOCIATES Corporation

  4. HLA Link To MUSE CEP JODA ELS EODA • JMRM FOM Too Different • JLVC Connectionless • NTF Connected / VBS2 JHIP HLA RTI MUSE Bridge ROLANDS & ASSOCIATES Corporation

  5. Decision To Go Direct • SOA Manifesto • Business Value Over Technical Strategy • Government Tied To Strongly To HLA Solution • MUSE Team and R&A Team Felt Direct Most Cost Beneficial • Strategic Goals Over Project-Specific Benefits • What Are They – Cost Effective Environment • Intrinsic interoperability over custom integration • Direct Connect Contrary To This Rule ROLANDS & ASSOCIATES Corporation

  6. Decision To Go Direct • SOA Manifesto • Shared Services Not Specific Purpose Software • We Viewed MUSE As The Service • Not How We Linked To The Service • Flexibility Over Optimization • Direct Connect Much More Flexible • Evolutionary Refinement Not Initial Perfection • JTLS Has Always Followed Rule • The Method Of Integration Has No Impact ROLANDS & ASSOCIATES Corporation

  7. Current Plan CEP JODA ELS EODA MUSE WES / Netlink JTLS Interface Module Detailed Naval Damage Consistent Entity Data Two Way Communication Change DIS Codes Need To Support 64-bit Windows DLL ROLANDS & ASSOCIATES Corporation

  8. Detailed Naval Damage • Riding Low • Forward, Aft, Full • List Direction • Port, Starboard • List Position • Forward, Aft, Middle • Fire Type • Smoke, Fire, Both • Fire Size • Small, Medium, Large • Oil Slick • With Debris, No Debris • Oil Slick Location • Around, Trailing ROLANDS & ASSOCIATES Corporation

  9. Consistent Entity Data • JTLS Entity Level Simulation (ELS) • Uses Templates • Admin Move • Defend • Attack Mounted • Attack Dismounted • Entity Priority Positions • When 1 Gets Killed, Lower Priority Entity Moves In ROLANDS & ASSOCIATES Corporation

  10. Consistent Entity Data • Large Number Of Entities • We Do Not Publish Each Location • Command Objects • Has Location • Each Entity Belong to Command Object • Has Offset From Command Object • Movement • If Command Object Moves - All Sub-Entities Move • If Entity Offset Moves – Only It Moves ROLANDS & ASSOCIATES Corporation

  11. Two Way Communication JTLS MUSE Bridge Entity Type And Location Info UAV Location – Reflected In JTLS Updates Intel Fires On Specific Entity Assesses Damage Updates Damage Of Specific Entity ROLANDS & ASSOCIATES Corporation

  12. Change DIS Codes • JTLS As An Operational Level Game • Significant Difference In What Is Important • Tactical Level Model • Activity In Terrorist Camp • Man Smoking a Pipe • Individual Cars Coming And Going • Operational Level Model • SSM Sites Preparing To Launch • SAM Sites With Non-Full Load ROLANDS & ASSOCIATES Corporation

  13. Change DIS Code • Proposed Two Methods • Within JLVC • Use FOM Characteristics • Long Lead Time – Because All Must Agree • Change DIS Code • Could Not Do Within JLVC • One Of The Primary Reasons Move To Direct Link ROLANDS & ASSOCIATES Corporation

  14. Change DIS Code SA-6 1.1.222.28.6.0 Meaning 0 Missiles Fired SA-6 1.1.222.28.6.1 Meaning 1 Missile Fired ROLANDS & ASSOCIATES Corporation

  15. Current Status • 64-Bit DLL JODA Libraries • Developed - In Testing • Means JTLS Does Need To Maintain • First Integration Test – October 2012 • Second Integration Test – November 2012 • Demonstration • JTLS International Users Conference • 11 and 12 December ROLANDS & ASSOCIATES Corporation

  16. Future Capabilities • JTLS Feed Unrealistic • Road Network • Automatic Vignette Generation • When Convoy Loading / Offloading • Have People Acomplishing the Task ROLANDS & ASSOCIATES Corporation

  17. Questions ROLANDS & ASSOCIATES Corporation

More Related