1 / 9

Aggressive Fox Implementation Planning Report

This report outlines the new project development risks faced after reviewing the system draft, milestones achieved, finalized schedules, costs, and documents. It includes a summary of successes, problems, process refinement, positive critique of partner group's specification, and CoCoMo effort estimate.

kyran
Download Presentation

Aggressive Fox Implementation Planning Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CS3240 Group4aAggressive FoxImplementation Planning Alex, Brittany, Decy, Paul

  2. New Risks • A list of three new project development risks that you face now that you have seen the draft • specification for your part of the system.

  3. List of Milestones • Finalized implementation schedule and Gantt chart • Finalized software cost estimate • Finalized development environment and protocol documents • Finalized system design documents • Software prototype passed movement testing • Software passed special feature testing • Software passed integration testing • Software passed final inspections • System delivery

  4. Schedule

  5. Work Breakdown Structure

  6. Gantt Chart

  7. Process Report • • A summary Process Report for the project to date: • — A list of successes that you have had. • — A list of problems that have arisen. • — An approach to process refinement, i.e., what you have done and are doing to improve • your process. • • A positive critique of your partner group’s specification: • — A detailed list of questions. These should be questions of detail and of understanding of • the specification that you have received. • — A list of good points. Look for creative concepts in the functionality, correct use of the • technology we have been discussing, and quality of document preparation and • presentation. • • A CoCoMo effort estimate for the software development activity. Use the basic model for an • organic system. For reference, the original paper describing CoCoMo is on Collab.

  8. Positive Critique • 3 new project risk w/ specification

  9. CoCoMo Effort Estimate • 3 new project risk w/ specification

More Related