Request for Qualifications: Design Consulting Services for Consolidated Rental Car Facility (“CONRAC”)- Airport Transit Center. Presented by: Aviation Department and Capital Improvements Management Services Department. Project Background.

laban
Download Presentation

Presented by: Aviation Department and Capital Improvements Management Services Department

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Request for Qualifications:Design Consulting Services forConsolidated Rental Car Facility (“CONRAC”)- Airport Transit Center Presented by: Aviation Department and Capital Improvements Management Services Department

  2. Project Background • Project encompasses the plan and design of a consolidated rental car facility and other landside facilities. • Scope driven by 2011 Airport Master Plan and 2008 Ricondo study. • Construction Manager at Risk method will be used for construction phase.

  3. Project Objectives • Improve to customer service • Improve air quality, reduce vehicle emissions • Enhance operational efficiency • Ease terminal curbside congestion • Friendly interface between ground and air transport services • Plan for future needs

  4. CONRAC Plan Intent • RAC Customer Service Center • Ready/Return Capabilities of approx. 2,600 spaces • Quick Turn Around Facility including vehicle fueling systems • Vehicle Wash Systems • Vehicle Service Support • Public Parking • Security Systems • Commercial Opportunities • Passenger/Employee Services

  5. Minimum Qualifications • Staff must include licensed Architect or Engineer • Prior transit center experience • $50M in total construction cost • Completed within the past 10 years • Airport characteristics similar to SAIA • Coordination of multiple stakeholders

  6. Scope of Work • Phase One: Programming, rough magnitude cost estimate, issue identification • Phase Two: Development of 100% construction documents • Phase Three: Construction administration, resident inspection

  7. Solicitation Schedule • Deadline for submission of written questions: October 11, 2012, 4:00 P.M. • Responses Due: October 24, 2012, 2:00 P.M. • Interviews: Week of November 26th

  8. VII. Required Documents • Signature Page • Submittal Checklist/Table of Contents • Discretionary Contracts Disclosure Form • This is a High Profile contract

  9. VII. Continued: Evaluation Criteria

  10. SBEDA Program • Lisa Brice, Special Projects Manager for the San Antonio International Airport • Award of SBEDA Evaluation Criteria Points • SBEDA Ordinance Compliance Provisions (RFQ, Section X.)

  11. Submission Instructions • 1 Original Statement of Qualifications (“SOQ”) • 1 PDF Copy on a CD • 10 Copies of SOQ All documents must be complete and submitted at the Office of the City Clerk by 2:00 p.m. on October 24, 2012.

  12. Award of Contract and Reservation of Rights • Respondents are able to request a Solicitation Process Review via written request. • Submittal Debriefings are available once annually to all respondents via written request.

  13. Questions?