An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bay Area Transportation: Achievements & Challenges Contra Costa CountyTransportation Town Hall May 25,2006

  2. Bay Bridge Update • $5.5 Billion project to replace East Span moving full speed ahead • Solid Financing Plan approved by the legislature in 2005 preserves equitable state/local split • Tolls rise to $4 in January 2007 • $1.4 billion SAS awarded April 2006 to Joint Venture American Bridge/Fluor Enterprises • Skyway portion now 88% complete • New bridge targeted to open for traffic in 2013

  3. California has a Transportation Crisis • Imperiling our economy • Degrading our quality Of life • Threatening our Environment • Jeopardizing our future

  4. The Crumbling of An Empire Once the envy of the world, California’s roads and highways are now the worst in the nation • Caltrans estimates the value of our state highway system at $300 billion • We must take immediate action to preserve this enormous asset

  5. Declining Pavement Maintenance • Caltrans’ road maintenance division estimates a $587 million backlog in deferred maintenance on state highway system Source: Legislative Analyst Office, February 2004

  6. Miles Traveled Source: Legislative Analyst Office, February 2004 Lane Miles Added, Source: Federal Highway Administration Growing Pressure on State Highways

  7. Congestion Costs California Billions • Three of the 5 most congested U.S. urban areas — and 6 of the top 15 — are in California • Los Angeles • San Francisco/Oakland • San Diego • San JoseSacramentoBakersfield • Cost of congestion = extra fuel + wasted time + lost productivity • Total cost for California: $20.7 billion every year

  8. State of the System: Top 10 Worst Highway Bottlenecks

  9. State Gas Tax Hasn’t Kept Pace The state’s gas tax has lost one-third of its value since 1964, adjusted for inflation.

  10. Feds to the Rescue? Not Likely • Purchasing power of federal gas tax has also eroded due to inflation

  11. Growth Trends: 2000–2030 • California’s population to grow 41% • Bay Area’s population to grow 29%

  12. How we will meet the Challenge Shortfall$18 billion • Transportation 2030 Plan based on 3 main themes: • Adequate Maintenance • System Efficiency • Strategic Expansion • Financially Constrained Element • Vision Element Projected Revenues$118 billion

  13. Where Is All the Money Going?

  14. Would $20 billion Infrastructure Bond Make a Difference? • Estimated $4/5 billion to Bay Area over next 10 years • Significant down payment, but no silver bullet • $1.3 billion for Bay Area Transit • $375 million for Local Streets and Roads • $225 million for State Transportation Improvement Program • Estimated $2 billion-plus for Corridor Mobility, Trade Corridors, Transit Security and State-local Partnership

  15. Proposed I-bond: Contra Costa Close up Public Transportation Modernization & Improvement State Transportation Improvement Program

  16. Proposed I-bond: Contra Costa Closeup (Continued) Local Streets And Roads Contra Costa County Total $52 million

  17. Corridor Mobility Program Trade Corridors State-Local Partnership Transit Security Decisions to be made by CTC Eligible Projects could include: Caldecott Tunnel 4th bore e-BART Highway 4 widening Other I-Bond Funding Sources Could Boost Contra Costa Projects

  18. More Work to Be Done • I-Bond an important step in the right direction • Respects local decision-making instead of specific earmarks • Leaves $12–15 billion hole that still must be filled

  19. Other Potential Revenue Sources • Steep hill to climb • To make wise investment choices, MTC supports performance-based approach • MTC will need help from local partners, state legislators

  20. For More Information or to Download this Presentation Go to: www.mtc.ca.gov