1 / 7

Sub Committee 6 Liaison report

Sub Committee 6 Liaison report. June 2013 Mike Briggs. Ballots. API 6HT, 2nd Edition – Ballot closed and document has been released Re-ballot API 14H, 6th Ed Ballot is currently open and closes on July 4 th. Ballots (cont’d). API 6X 1 st Edition ballot closed 04/30/13 –

laken
Download Presentation

Sub Committee 6 Liaison report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sub Committee 6 Liaison report June 2013 Mike Briggs

  2. Ballots • API 6HT, 2nd Edition – Ballot closed and document has been released • Re-ballot API 14H, 6th Ed Ballot is currently open and closes on July 4th

  3. Ballots (cont’d) • API 6X 1st Edition ballot closed 04/30/13 – • the document will possible require re-ballot depending on the changes required to resolve ballot comments

  4. Ongoing workgroups and task groups

  5. TG 1 – Pipeline and valve standards • Currently working on the 24th Edition of API 6D • Will be adding PSL levels to 6D • Evaluating addition of a class 4500 to address higher pressures • Working on revision to 6FD • Work on revision to 6DSS in January 2014

  6. TG2- Wellhead Standards and Corrections 6A 21st revision • Cutoff for new items to be included in 21st Edition is August 15th 14H Update • Comment resolution for initial ballot resulted in substantive changes and a new ballot has been issued which will close on the 7th of July 2014 6AVR Plugs • Currently doing Annex F PR2 testing (0°F-250°F)prototype testing on a 4” HPVR plug. This plug will be included in the 21st Ed of API 6A

  7. Revision to API 6A718 • Working in conjunction with the 5CRS workgroup • Currently waiting for 5CRA ballot to close before finalizing the new draft of 6A718. • Adding additional alloys to the 6A718 document. • A 140K strength class is being added

More Related