History of Scientific Ocean Drilling

Introduction to Riser Drilling Vessel Chikyu - Earth 18 th ISOM 6 - 7 Oct.2004 in Greece Captain Kenji Adachi G lobal O cean D evelopment I nc. History of Scientific Ocean Drilling. Integrated Ocean Drilling Program (IODP) Oct. 2003. Project Mohole 1958 - 1966

lalasa
Download Presentation

History of Scientific Ocean Drilling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction toRiser Drilling VesselChikyu - Earth18thISOM 6-7 Oct.2004 in GreeceCaptain Kenji AdachiGlobalOceanDevelopmentInc.

  2. History of Scientific Ocean Drilling Integrated Ocean DrillingProgram (IODP)Oct. 2003 Project Mohole 1958 - 1966 The AmericanMiscellaneousSociety Deep SeaDrilling Program (DSDP) 1968 - 1985 Ocean Drilling Program (ODP) 1985 - 2003 Glomar Challenger USA F, UK, Jp, USSR (1975) Chikyu + US conversion Japan, USA Joides Resolution(Sedco/BP 471) 20 countries Cuss 1 USA

  3. Drilling into the Mantle through MohoIODP Final Goal? Project Mohole 1958 - 1966 Mount Fuji3,776 Averagecrustcontinent 35-40 km Average crustmarine 5-11 km Km.

  4. Compare 2 drilling Vessel 118.4m

  5. Top Drive Riser Pipe Drill Bit Blow Out Preventer (BOP) Riser & BOP

  6. The mud is pumped into the drill pipe from the ship, and then circulated out into the borehole from the drill bit. Removing Cuttings Protecting and stabilizing the Borehole Wall On board Sea level Cooling and Lubrication of the Bit Sea floor The mud acts as a lubricant for the bit and protects the bit from wear and tear. It also cools the bit against the rising temperatures inside the Earth. Mud containing cuttings rises through the rise pipe and is returned to the ship for cuttings analysis and reuse Drilling Method Using Mud Circulation

  7. CHIKYU

  8. Blow Out Priventer (BOP)

  9. BOP at Moon Pool

  10. Riser tensioner on the Moon Pool

  11. On deck devices

  12. Bridge

  13. Accommodation

  14. Inside facilities

  15. Lab

  16. A necessity for an American

  17. An Oasis on the Sea

  18. Schedule in the future Construction, commissioning and testing Apr. 2005 : JAMSTEC take delivery 2005 - 2007 : Training voyage in Japan Apr. 2007 : Commencing international program

  19. Acknowledgement We thank to the following institutions and personel for their kind offering various data and facilities Jamstec :Japn Agency for Marine-Earth Science and Technology http//www.jamstec.go.jp IODP :Integrated Ocean Drilling Program http//www.iodp.org ODP :Ocean Drilling Program http//www-odp.tamu.edu NAS :National Academy of Sciences http//www.nas.edu.history We would like to have special thanks to Dr. K. Fujioka for this kind advises during the preparation of this talk.

  20. Thank you for your attention.