1 / 11

Features of the new TCP/IP link between HK and Beijing (Guangzhou)  

Features of the new TCP/IP link between HK and Beijing (Guangzhou)  . Justin Waiman MA Hong Kong, China. ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS) TOULOUSE, France, 26 - 30 MAY 2008. Hong Kong – Beijing Circuit. Link established since early 70 ’ s

Download Presentation

Features of the new TCP/IP link between HK and Beijing (Guangzhou)  

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Features of the new TCP/IP link between HK and Beijing (Guangzhou)   Justin Waiman MA Hong Kong, China ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  2. Hong Kong – Beijing Circuit • Link established since early 70’s • Routed through Guangzhou • Original bandwidth 64kbps DDN link • IP-based, FTP • Meteorological data exchange – global, regional and local (Guangzhou) ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  3. Hong Kong –Beijing Circuit Hong Kong ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  4. Khabarovsk Washington 64K Part of the RAII Regional Meteorological Telecommunication Network as of 15 December 2007 IMTN-MDCN CIR<32/768K> Novosibirsk 14.4-28.8K (V.34) via Moscow 14.4-28.8K (V.34) 768K 28.8-9.6K (V.34) PyongYang Ulaanbaatar Tokyo 14.4K 64K CMA PCVSAT EUMETSAT 1M IMTN MDCN MPLS 32K 2M MPLS 2M 2M Beijing F/R CIR <16/16K> F/R CIR <32/32K> IMTN MDCN MPLS 2M Seoul 2M F/R CIR <16/16K> Offenbach 64K 64K 75 Internet Hong Kong CMA PCVSAT Macao ISDN 128K Melbourne CMA PCVSAT Hanoi 1M 100 IMTN MDCN MPLS Moscow 128K F/R CIR <16/16K> Vientiane 9.6K F/R CIR <16/16K> IMTN-MDCN CIR<16/32K> Yangon 1200 64K 50 Manila Bangkok Internet Phnom Penh Melbourne F/R CIR <16/16K> F/R CIR <16/16K> Singapore Kuala Lumpur ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  5. Feature of the new HK-GZ Link • Implemented on 22 May 2008 • 4M guaranteed bandwidth both upstream and downstream • 60 times faster than the original one • Ethernet based interface • Bandwidth partitioning by QoS at router level • Support Multi-Points solution for extend to other sites in the future. ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  6. HK-GZ GTS network connection Guangdong Meteorological Bureau Hong Kong Observatory International Ethernet 4M Metro Ethernet CISCO2821 4M MSTP 4M Server Server Server Fire Wall / DMS Fire Wall Server Video Conference Unit Video Conference Unit ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  7. HK-GZ GTS network connection • Local access network: Metro-Ethernet • Core network: International Ethernet • Service delivery over VPLS (Virtual Private LAN Service) based network • Layer 2 private network • Provider network acts as a bridge • Advantages: • LAN environment • Multipoint to multipoint • Flexible bandwidth allocation which ranges from 1Mbps to 1Gbps ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  8. Physical layer Setting • Technology: SDH (Synchronous Digital Hierarchical) over optical fibre • Topology: Ring • High resilience • Self healing ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  9. Physical layer ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  10. Current Status and Looking Forward • Being use for real time meteorological data exchange • Planned to configure for different channels for large volume data exchange (e.g. raw radar data) and video conferencing ISS/Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)TOULOUSE, France, 26 - 30 MAY 2008

  11. Thank you

More Related