1 / 14

Status = Fully Implemented

Status = Fully Implemented . On December 23, 2009 the website for the ProTeach Portfolio was launched at www.waproteach.org . On January 4, 2010 the online registration opened for business . Continuum of Educator Development See “What’s New” at www.pesb.wa.gov.

lamont
Download Presentation

Status = Fully Implemented

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status = Fully Implemented • On December 23, 2009 the website for the ProTeach Portfolio was launched at www.waproteach.org. • On January 4, 2010 the online registration opened for business.

  2. Continuum of Educator DevelopmentSee “What’s New” at www.pesb.wa.gov

  3. Uniform and External Assessment for the Professional Certificate • WA Learns Commission: Need for Uniform and External Assessment • Too much variance among programs • 2007/08 legislative charge to the PESB: • Set standards, develop, pilot and implement a uniform and external assessment for the professional certificate.

  4. 2009 Legislation • Beginning 9/1/11, 1) may earn prof cert with minimum 2 years as defined by PESB and results of assessment authorized in 2007/08, and 2) may not require to enroll in higher edprocert program. • PESB defined minimum 2 years of experience as 1.5 FTE--and do not have to be employed, but must hold valid residency cert. • Between 1/1/10 and 9/1/11, candidates have two options: attend a higher edprocert program or submit to ProTeach Portfolio. See website for list. • 9/1/11—all candidates submit to ProTeach Portfolio.

  5. Other PESB Policy • Approved the changes to WAC 181-79A adding elements to the external assessment including the PGP and PGT (PGT will still receive clock hours.) • Residency certs expiring in 2010 or 2011can register for ProTeach Portfolio and receive a two-year renewal.

  6. Highlights • Fully electronic end-to-end online assessment • Candidates have own private, secure website • Maximum flexibility and choice for registration & submission • Examples for the various textboxes are available online

  7. More Highlights • WA educators trained and used as scorers • Assessment results will be used to educate the system for continuous improvement • Validity and reliability monitored overtime • Registration fee: $495

  8. The Entries and Rubrics • Entries measure and are fully aligned to 3 standards and 12 criteria • #1 – Professional Growth and Contributions • #2 – Building a Learning Community • #3 – Curriculum, Instruction and Assessment • Rubrics aligned to each criterion • Composite score = sum of 12 criterion scores • Passing standard set after 1st operational cohort plus pilot portfolios

  9. Administration and Management • Administered by ETS and LiveText • Ethics and Integrity Policies ensure each candidate submits their own work

  10. Proposed PESB Policy Change • In May 2010 the board will consider a cost neutral proposal to award 150 clock hours to candidates successfully completing the ProTeach Portfolio.

  11. Length of Residency Cert • At what point should teachers engage in the Professional Certificate process? • Previously – too drawn out / up to TWELVE years • Appropriate post induction – years 3-5 • At what point, if not successful on ProTeach will we withdraw licensure? • Expectation will be completion by end of year 5 • Conditions for renewal (2, 2-yr renewals): • Lapses in employment • Attempted and failed

  12. Verifying Teachers Working in State Agencies Providing Ed Services to Children • Eligibility (1.5 FTE in at least 2 years) is verified at registration. • If ineligible or record incorrect, a message will appear with a form to be downloaded. The form and documentation should be taken, faxed or mailed to the nearest ESD for correction of the record.

  13. Candidate Support Providers • Several ProTeach Portfolio Support Providers operating • Go to http://sites.google.com/a/pesb.wa.gov/staff for list, or http://www.pesb.wa.gov/Assessment/WAProTeach.htm for list with contact info

More Related