Objective: To create a collaborative environment in the NSTX control room

NSTX Control Room Display Wall S. Kaye , M. Cropper, S. Davis, E. Feibush, A. Finklestein, N. Galioto, S. Klasky, K. Li, G. Oliaro, T. Stevenson, G. Wallace, I. Zatz 9/22/03. Objective: To create a collaborative environment in the NSTX control room

lan
Download Presentation

Objective: To create a collaborative environment in the NSTX control room

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NSTX Control Room Display WallS. Kaye, M. Cropper, S. Davis, E. Feibush, A. Finklestein, N. Galioto, S. Klasky, K. Li, G. Oliaro, T. Stevenson, G. Wallace, I. Zatz9/22/03 • Objective: To create a collaborative environment in the NSTX control room • Shared graphics, movies, logbook etc among control room computers, display wall • Establish a Gbit speed LAN in control room • Link up Macs and PCs (Xterms excluded) • Can be used for displays during run and at after-run meeting • Initial system will be optimized for collaboration within control room • Users outside c.r. can possibly limit performance (at present) • This should be considered an ongoing development project

  2. Cost of System is Minimal “$40-60K seems like a good target” R. Goldston, ~10/02 “OK” (grimace) M. Ono, same mtg. Equipment Cost Inc. Cost to NSTX 2 NEC projectors $21.6K 0K (PICSIE) 2 ceiling mounts $ 0.6K 0.6K 1 6x24 flat screen/frame $2.1K 0K (already budgeted) 1 display computer $4K 4K 1 collaboration comp. $2.2 K 2.2K Gbit switch 0K Gbit cables $1K 1K Labor+misc $1K 1K Total $8.8K Computer upgrades will speed up system (G5, Linux)

  3. Minor Control Room Modifications • Heating systems crew • Relocate air duct, EVEs alarm on screen wall • Install ceiling mounts, wiring for projectors • Install mount, wiring for display computer • Install screen • Install drops for Gbit cables (N. Galioto)

More Related