1 / 8

Industrial Process Offerings and Capabilities May 8, 2003

Industrial Process Offerings and Capabilities May 8, 2003. Atmosphere Recovery, Inc. 15800 32nd Avenue North, Suite 110 Plymouth, MN 55447 Ph: (763) 557-8675 Fax: (763) 557-8668 Web: www.atmrcv.com E-mail: rrr@atmrcv.com. Company Background. Founded 1994 - Corporate & USDOE R&D

Download Presentation

Industrial Process Offerings and Capabilities May 8, 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Industrial Process Offeringsand CapabilitiesMay 8, 2003 Atmosphere Recovery, Inc. 15800 32nd Avenue North, Suite 110 Plymouth, MN 55447 Ph: (763) 557-8675 Fax: (763) 557-8668 Web: www.atmrcv.com E-mail: rrr@atmrcv.com

  2. Company Background • Founded 1994 - Corporate & USDOE R&D • Furnace Process Assessment • Energy & Environmental Reduction Potential • 1995-1998 - Process Gas Recovery and Recycling System Development • 1997-2000 - Laser Raman Gas Analyzer & Gas Control Development • 2000-2001 – Analyzer/Controller Field Trials and Expansion of Applications • 2002 - – Commercial Technology and Service Offerings

  3. Capability Summary • Equipment, Installation & Service • Raman Laser Gas Analyzer/Controller • Gas Blending Panel Systems • Gas Recovery & Recycling Systems • Consulting Services • Furnace Process Gas and Equipment Analysis • Manufacturing Process Troubleshooting, Development & Improvement • Industrial Environmental Monitoring, Compliance & Energy Efficiency • Novel Gas Process Development & Testing

  4. Products & Services Offered • Process Gas Analysis & Control Equipment • Laser Gas Analyzer (LGA) – Measures Gas Only • LGA Gas Process Controller (Using Existing Equipment) • LGA with Integrated Gas Safety & Blending Panel • Membrane Based Process Gas Recovery & Reuse Systems • Gas Process Evaluation & Improvement • Analysis, Monitoring and Assessment Services • Furnace Problem Troubleshooting and Resolution • Advanced Manufacturing & Process Control Consulting • Energy and Process Gas Conservation • Air Emissions Reduction & Compliance • Advanced Industrial Gas Based Manufacturing Processes • Research & Development Assistance • ARI Proprietary Process Implementations

  5. Customer Benefits • Gas Control Using Existing Equipment • Improved Product Quality & Consistency • Reduced Destructive Analysis Costs • Reduced Scrap & Re-Work Costs • Enhanced Process Documentation • Maintenance Early Warnings • Enhanced Process Safety • Gas Control with Integrated Gas Panel • Increased Production Capacity • Reduced Industrial Gas Cost • Reduced Energy & Compliance Costs • Lower Cost Production Processes • Gas Control with Gas Recovery & Reuse • Maximize Production Capacity • Minimize Gas, Energy & Emissions Cost • Enhanced & New Product Properties

  6. Publications Featuring ARI Technology

  7. Technology Investment • Laser Gas Analyzer • Exclusive License for Patented Detector • $20M Spent to Develop • Advanced Process Gas Control • Proprietary Control Hardware & Software • Non-Equilibrium Blending and Reactions • $2M Spent to Develop • Recovery & Recycling Methods • Proprietary Extraction, Filtration, Selective Permeation and Re-Blending Combinations • 1.5M Spent to Develop • Advanced Process Test Equipment • Automatic Real-Time Transportable Unit • $300K Spent to Develop

  8. Production & Services Capacity • Process Gas Analysis & Control Equipment • Laser Gas Analyzer/Controller Units • Current: 3 per Month • Within 6 Months*: 25 per Month • LGA with Integrated Gas Safety & Blending Panel • Current: 2 per Month • Within 6 Months*: 10 per Month • Membrane Based Process Gas Recovery & Reuse Systems • Current: 4 per Year • Within 1 Year*: 1 per Month • Gas Process Evaluation & Improvement • Analysis, Monitoring and Assessment Services (All Types) • Current: 2 per Month (Average 7 Day Consulting) • Within 1 Year*: 4 per Month (Average 7 Day Consulting Service) • Advanced Industrial Gas Based Manufacturing Processes • Current: 2 per Year • Within 1 Year*: ??? * Assuming Standard Products & Services and Sufficient Customer Demand

More Related