An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CIGRÉ – 2009 Activity Report for SC C6DISTRIBUTION SYSTEMS AND DISPERSED GENERATION David Jacobson (C6) Manitoba Hydro

  2. Outline • Scope and Objectives of the SC • Working Group Activities • Recent activities • New working groups • 2010 Preferential Subjects

  3. SC C6 - Distribution Systems and Dispersed Generation - Scope • Assessment of the technical impacts and requirements that a more widespread adoption of DG and variable generation (RES) could impose on the structure and operation of the T&D systems. • Issues like rural electrification, Demand Side Management, use of storage are also included. • 10 Active WGs. 8 will be complete in next year.

  4. SC C6 Active Working Groups

  5. SC C6 Active Working Groups – cont.

  6. WG C6.08 Integration of a large share of fluctuating power • Technical Brochure to be published in 2010 and will cover following topics: • Power Flow and congestion management in networks • Frequency control and operating reserve requirements • Voltage stability • Transient stability • Reactive Power Control and Voltage Control Capability • Influence of wind on conventional generation • National regulatory and support strategies for wind

  7. SC C6 Working Groups – Proposals A strategic advisory group will review the Cigre Technical Committee “Network of the Future” Roadmap and propose areas of activities for C6.

  8. SC C6 publications - 2009 • ELECTRA, June 2009,“Rural Electrification: A Scoping Report, WG C6.13”. • ELECTRA, August 2009, “The Challenge of Rural Electrification: CIGRE’s Strategy and Organizational Approach”.

  9. SC Meeting • July 2009 – Calgary, Alberta – Cigre/IEEE Symposium Wind Integration • August 2010 – Paris • 2011 – Brazil or Italy (TBD)

  10. 2010 Paris Preferential Subjects • PS1: Planning and operation of networks incorporating dispersed energy resources and renewables (DER/RES) (23 papers) • Performance characteristics of distribution networks with high penetration of DER/RES, operating experiences • Effect of large scale integration on reliability • Provision of ancillary services by DER/Res • Regulatory schemes to support DER/RES and to implement smart grids • PS2: Demand Side Integration (8 papers) • Load characteristics of appliances • Practical experience of DSI through pricing • Vehicle to grid (challenges and opportunities) • PS3: New concepts and technologies for the electrification of rural and remote areas (8 papers) • Opportunities offered by microgrids and other advanced methods and renewables • Financing schemes, service delivery methods • Practical experience including system upgrades and grid connections