1 / 59

Labor/Management Symposium 2011

Labor/Management Symposium 2011. Col Homer C. Rogers, Director of The Human Resources Office. Welcome Housekeeping Negotiating team introduction Agenda MG Debbie Ashenhurst - The future of partnership Kathy Gulla – Pre-decisional involvement

lance-kent
Download Presentation

Labor/Management Symposium 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Labor/Management Symposium2011

  2. Col Homer C. Rogers, Director of The Human Resources Office • Welcome • Housekeeping • Negotiating team introduction • Agenda • MG Debbie Ashenhurst - The future of partnership • Kathy Gulla – Pre-decisional involvement • Jeff Tanner and COL Homer Rogers - Summary of 2011-2014 Contractual changes • MG Ashenhurst and Jeff Tanner – Partnership successes • Kathy Gulla – Current JPEC Issues • Labor/Management Panel – Question and Answer session • Cpt Dan Roche – Updates on TPR 430

  3. Executive Order 13522 from President Obama - 9 December 2009 • Purpose: to establish a cooperative and productive form of labor-relations throughout the executive branch • Management and the union are to discuss workplace challenges and problems and endeavor to solve them jointly • Allow employees and their union to have pre-decisional involvement in all workplace matters to the fullest extent practicable

  4. What is Pre-decisional Involvement? • Getting the union involved BEFORE you make the decision • Example: • “Union Rep, we have technicians who have deployed and I am going to change the work flows of this department. Do you have any issues with that?” vs. • “Union Rep, several of our technicians have been deployed and we need to do something different with the assignment of work. I would like to sit down with you and talk about this issue.”

  5. The Adjutant General MG Debbie A. Ashenhurst

  6. Pre-Decisional Involvement • Added in negotiations to JPEC Letter 11-01 • Pre-decisional involvement does not have to stagnate your operation • Can be as simple as an Email/call to your local union rep • You may be doing this already

  7. Examples of when pre-decisional involvement is appropriate? • Facility closure and moves • Contemplation of disciplinary action • Change in schedule • Change in duties • Work flow changes • Departmental policy changes

  8. Old Concept/New Term • Southwest Airlines • One of the world’s most profitable airlines • Largest U.S. airline (measured by # of passengers) • Highly unionized (10 CBA’s, 85% of employees union members) • L/M Philosophy – “Learn and listen not just for the sake of being courteous, but with a goal of genuinely understanding and evaluating another point of view”. (http://www.blogsouthwest.com/blog/labor-relations-southwest-airlines)

  9. Old Concept/New Term • COSTCO • America’s 6th largest retailer • 6% turnover compared to retail industry average of 59% • Fiscal year 03 COSTO averaged individual employee productivity of $379,090 in sales per associate outstripping its larger competitors like Walmart, Home Depot, Target and Kroger • L/M Philosophy – Encourage employees to make suggestions and air grievances. Entrepreneurial thinking is encouraged and rewarded.

  10. “Coming together is a beginning; keeping together is progress; working together is success”. Henry Ford

  11. Contract Changes January 2011- January 2014 COL Homer C. Rogers, Director HROJeff Tanner, President, AFGE Local 3970

  12. ARTICLE IV – SAFETY (no change)

  13. ARTICLE X – ANNUAL AND ADMINISTRATIVE LEAVE (no change) ARTICLE XI – OFFICIAL TIME (no change) Union officials will be given the flexibility to take care of union business ARTICLE XII – PERFORMANCE APPRAISALS (no change) TPR430 and its Ohio Supplement have changed. Training will be presented throughout the state in February and March ARTICLE XIII – SENIORITY (no change) ARTICLE XIV - REDUCTION IN FORCE (TPR change only) ARTICLE XV – DISCIPLINE (no change)

  14. Summary of Changes to Article XVI • The grievance is “owned” by the grievant. The grievance remains active until he/she is satisfied with the outcome or a final decision is made by the TAG • Grievance process is no longer within the Local Partnership Councils (LPCs) • LPC’s can still address all issues, but once a grievance is officially filed it is removed from the LPC Agenda • Potentially a 6 step process • All possible attempts should be made to resolve at the lowest level

  15. Summary of Changes to Article XVI(cont’d) • Not intended to be used as a “sneak attack”. The contract language includes: “Potential problems and concerns must be identified and communicated as they occur. Poor communication will lead to misunderstanding, unhelpful emotions and destructive outcomes”

  16. Summary of Changes to Article XVI(cont’d) • Informal stage = Step 1 • Not necessarily in writing (but could be) • Filed within 60 days of the event giving rise to the grievance (statute of limitations) • Filed with the immediate supervisor or level of command where the conflict exists • Must be resolved within 30 days of filing date or is considered dropped or may move on to Step 2 • Labor Representative may be involved

  17. Summary of Changes to Article XVI(cont’d) • Step 2 • Grievance now becomes “formal” • Must be in writing • Filed no later than 31st day after Step One filing or as soon as it is determined resolution is not possible at that level • Filed with the immediate supervisor or next level of command • Must be resolved within 20 days of filing date or is considered dropped or may move on to Step 3 • Labor Representative must be involved at this stage

  18. Summary of Changes to Article XVI(cont’d) • Step 3 • Must be in writing • Filed no later than the 21st day after Step Two filing or as soon as it is determined resolution is not possible at that level • Filed with the HRO • Must be resolved within 20 days of filing date or is considered dropped or may move on to Step 4 • Union VP and/or President must be involved at this stage • HRO and Union Officer determines appropriate level of management to involve and attempts resolution with parties

  19. Summary of Changes to Article XVI(cont’d) • Step 4 • Must be in writing • Filed no later than the 21st day after Step Three filing or as soon as it is determined resolution is not possible at that level • Filed with the appropriate ATAG • Must be resolved within 20 days of filing date or is considered dropped or may move on to Step 5 • Union VP and/or President must be involved at this stage

  20. Summary of Changes to Article XVI(cont’d) • Step 5 • Filed with the TAG • Positions from Step 4 management official and union official are submitted for review • A face to face meeting may be requested by either party • Filed no later than the 21st day after Step Four filing or as soon as it is determined resolution is not possible at that level • TAG will make final decision for resolution

  21. Summary of Changes to Article XVI(cont’d) • Step 6 – Arbitration with The Federal Labor Relations Authority • Outside of the Ohio National Guard

  22. Article XVII – Workplace Smoking Accommodations (no change)

  23. Article XIX – Agreement Duration, Modification, Renewal, the Precedence of Regulations – • Contract expires Jan 2014 • 2010 Negotiating Team added

  24. JPEC Letter 01

  25. JPEC Letter 02 – L/M Coordination Regarding Advertising Bargaining Unit Positions and Hiring/Promoting Procedures (No change)

  26. JPEC Letter 03

  27. JPEC Letter 04 – Guidelines for Service Component Partnership Executive Council (No change)

  28. JPEC Letter 05

  29. JPEC Letter 06

  30. Col Homer C. Rogers, Director of The Human Resources Office • Labor/Management Training for technician supervisors • Strategy • Timeline

  31. MG Debbie Ashenhurst, The Adjutant GeneralJeff Tanner, President, AFGE Local 3970 • Partnership Successes • Transformation Workgroup negotiated procedures for RIFs. • Conducted statewide service PEC symposiums, 2 Army and 4 Air. • Conducted joint L/M training; IBB and Hiring Training.  • Implemented Ohio TPRs (430, 351), published a Merit Placement Plan and new Tech Handbook.  • Completed all technician appraisals.  • Trained facilitators for all LPC, Service and Joint PECs.  • Published FECA charter.  • Published updated physical fitness policy memo.  • Army Maintenance Facilities Sub-Working Group. • Joint LPC MOA which brought together 3 LPCs developed a process which allowed joint service issues to be addressed at the local level. • Warrant Officer Program - Army PEC negotiated an agreement for how we assign techs to positions of increased responsibility • HRO and labor worked on several projects relocating SMO techs in the Columbus Metro area.

  32. Kathy Gulla, Labor Relations Specialist, HRO • Current JPEC Issues • Rewards system for labor-management success • Emphasis on need for maximum flexibility to allow labor representatives to conduct official business • Employee Assistance Programs for non-dual status • Administrative Leave for death of immediate family member • Grievance Form/Tracking sheet

  33. Question and Answer • For Management • MG Debbie Ashenhurst, The Adjutant General • Col Mark Bartman, Assistant Adjutant General, Air • COL John Harris, Assistant Adjutant General, Army • COL Homer Rogers, Director HRO • For Local 3970 • Jeff Tanner, President, AFGE • Mike Dohrman, Secretary/Treasurer, AFGE • Justin Willie, VP Army Surface Maintenance, AFGE • John Gibson, VP 121st, AFGE

  34. Ohio National GuardFamiliarization Training Ohio Technician Personnel Regulation (TPR) 430 & Performance Appraisal Application (PAA)

  35. Overview • TPR 430 Process & Delta • Performance Appraisal Application • Training Plan • POCs • Questions

  36. TPR 430 Changes: • Critical Elements and Standards must be written in combination • Supervisory Critical Element includes EEO/EO, managing performance, upholding merit principles, and workplace safety • Interim Review • NGB Form 430 includes all parts of the performance management process, and is completed online • Alignment with mission goals • No more 10-Month Probationary Retention Appraisals (Notification is through My Workplace) No Change: • Level 1 thru 5 Rating Pattern • Birth Month Appraisal Cycle • 120 day minimum rating period • Postpone appraisal in limited circumstances • Basis for performance based awards • PIP recommended for marginal performance, required for unacceptable performance • Performance based actions include reassignment, change to lower grade, removal • Appeals processes clarified

More Related