100 likes | 218 Views
Pine Bluff Arsenal Associated Project Work Standard Study. Principal Investigator: Dr. Steven L. Johnson Assistants: Karen Kelly, Jennifer Farris, Gim Goh, Sudeep Acharya, Oon Wei-Chek. Project Overview. Objectives Measure current times for production operations.
E N D
Pine Bluff ArsenalAssociated ProjectWork Standard Study Principal Investigator: Dr. Steven L. Johnson Assistants: Karen Kelly, Jennifer Farris, Gim Goh, Sudeep Acharya, Oon Wei-Chek
Project Overview • Objectives • Measure current times for production operations. • Perform ergonomic and methods analysis for operations within production lines. • Set new time standards for all production lines. • Use simulation to analyze production line operations and suggest improvements.
Process Documentation and Methods Analysis • Documentation of current production line operations station by station. • Element Description • Raw Data Time Sheets • Summary of Time Sheets • Crew Size for Each Production Line
Example: Raw Data Time Sheets**Actual data values have been changed. Times are in 1/100 minutes.
M929 Load, Assembly, and Pack (LAP) M929 WP Fill M722 LAP M722 WP Fill M767 LAP M767 Body Load M819 LAP M819 RP Mix, Fill, and Press M825 Rework M1006 Projectile Glatt Smoke Mix M18 Grenade M83 Grenade Grenade Packout M291 Decontamination Kit Production Lines Analyzed
Arena Analysis Simulation Modeling of M929 LAP Line Using Arena 3.01
Conclusions • Recommended work standards for current operations on production lines studied. • Recommended methods and job content improvements through ergonomic and methods analysis. • Used simulation to suggest new line set-up for M929 production line.