80 likes | 178 Views
Lab Results Interfaces S&I Framework Initiative. Bi-Weekly Initiative Meeting. September 12, 2011. Agenda. Moving Forward Implementation Guide Update Workgroup Updates Q&A + Group Discussion. Summer of Standards Harmonization. Begin Code Development. F2F Meeting. IG Draft Version 0.1.
E N D
Lab Results InterfacesS&I Framework Initiative Bi-Weekly Initiative Meeting September 12, 2011
Agenda • Moving Forward • Implementation Guide Update • Workgroup Updates • Q&A + Group Discussion
Summer of Standards Harmonization Begin Code Development F2FMeeting IG Draft Version 0.1 HL7 Out of Cycle Ballot • April: • Lab Reporting Implementation Guide Analysis – policy and Conceptual Designs drafted • In-scope Test approach reviewed and outlined • May: • Recommendations for IG • Vocabulary recommendations completed • Vocabulary alignments completed • Complete Public Health High Level Roadmap • June: • Final F2F Meeting to come to consensus (proposed Jun 13-15) • Prepare any needed documentation for RI/DP • IG guide drafted • July: • Initial Pilot planning • IG Guide Version 0.2 drafting completed • August: • IG Version 0.3 drafted • Report findings to HITSC • September: • “Key Stakeholder” Messaging and Outreach • IG Version 0.5 drafted • HL7 ballot opens for IG • Pilot launch • Fall: • Draft MU Stage 2 Rule Major Upcoming Milestones We Are Here
Implementation Guide Update • The LRI IG v0.5 has been posted to the wiki for comments • http://wiki.siframework.org/LRI+Draft+Implementation+Guide • Comments should be made by 8:00AM EDT 9/14 • Comments received after 8:00AM EDT 9/14 will be incorporated, time permitting, or held over for consideration along with other ballot review comments • Submission to HL7 will be noon PDT 9/15
Implementation Guide Analysis WG • Volunteer Leads: Ken McCaslin, Hans Buitendijk Action Items/Next Steps • Regularly scheduled Tuesday/Thursday meetings for this week are cancelled due to the HL7 conference in California • The IG WG will meet to wrap up loose ends on 9/14 10:00-11:00AM EDT • Members should add their F2F availability to the IG WG F2F survey
Validation Suite WG • Volunteer Lead: Robert Snelick Action Items • Reviewed draft LIS Test Plan and EHR Test Plan Template • Discussed formation of test data addressing identified issues – i.e., treatment of LOINC codes • Developed spreadsheet of segments, fields and components constrained by LRI IG Next Steps • Call for committed workgroup members participation • NIST LRI Test Tool • Test Data collection, SME review and verification • Prepare for October Face To Face • Design and configure prototype test case • Collaborate with Vocabulary WG and other SMEs in developing and peer-reviewing test data • Software development of Validation Suite components
Pilots WG • Volunteer Leads: Robert Lutolf and Rob Allen Action Items • Update LRI Pilot Guide • Define Timeline • Developed Outreach Strategy for recruitment of new Pilots Next Steps • Continue Pilot Outreach • Prepare for October Face To Face • Committed Pilots complete Pilot Project Brief Wiki page and develop a plan to complete steps in Pilot Guide