CMM Overview A Focus on Level 2. James R. Persse LightTouch Systems, Inc. The Software Engineering Institute’s Capability Maturity Model. Reduce Risk The Unknown Is Bad. What Introduces Risk?. Unrefined Expectations Poor Planning Poor Oversight Floating process to build software.
E N D
CMM OverviewA Focus on Level 2 James R. Persse LightTouch Systems, Inc.
The Software Engineering Institute’sCapability Maturity Model
What Introduces Risk? • Unrefined Expectations • Poor Planning • Poor Oversight • Floating process to build software
Sources of Risk • Pressure to get the product out. • Outside agencies force constraints on IT. • Too much work and tight resources. • Staff Turnover.
Can You Remove All Risk?No.But Over Time You Can Remove A Lot
Remove Risk byImproving how you build software By Examining The Steps You Follow. Then Working to Make those Steps more Effective.
SoftwareProcess ImprovementEmerging as a big concernin Fortune 500 IT shops
1996 StudyAverage Fortune 500 New Software Project • 189% Over Budget • 222% Over Schedule • 30% Incomplete Functionality
CMM is a Tool to address this situation There are others: ISO, Demings, Baldridge, etc.
Equation Theory • High Risk = Low Predictability • Low Predictability = Low Chance for Quality • Maturity = Low Risk + High Predictability
Risk Predictability
Software Process Improvement CMM is a means to an end CMM Goal: SPI
Risk Level 5 Level 4 Predictability Level 3 Level 2 Level 1
Some Risk will always remain.With CMM you manage Risk proactively.
Level is 2 is Step 1 • It’s the beginning of an SPI program. • You don’t have to be extensive. • You don’t have to be perfect.
The Repeatable Level A Good Way to Analyze how you build software is to repeat what you do from project to project.
The Path to Improvement 1 Define a process. 2 Follow the process. 3 Study the results. 4 Keep what worked. 5 Throw out what didn’t. 6 Start over again.
At Level 2You begin SPI by focusing on 5 areas.Key Process AreasAreas where you develop processes you can repeat and study.
The Central Idea of Level 2 Look at what you do Throw out what does not work well Keep what does work well Refine Repeat
Level 2 Key Process Areas • Requirements Management • Software Project Planning • Software Project Tracking and Oversight • Software Configuration Management • Software Quality Assurance
What each KPA has in Common • A Policy to show you are committed to doing certain things. • A Structure (resources – people and tools -- and funding) to carry it out. • A Plan to document what you will do. • A Process to follow for doing it. • Training to prepare your people to act according to process.
Basic Level 2 Activityfor each KPA Put the right people in place Have them develop plans to predict activity Follow the plan Measure how well it worked Refine Repeat
Requirements Management • Work with Documented Requirements • Have the team Review them and accept them • Track them as they change
Requirements Management • Person/People appointed to analyze • Process to Analyze and Accept and Track
Software Project Planning • Have Requirements and Statement of Work • Get input/estimates from team • Create a Plan • Review the plan with the team before starting
Software Project Planning • Assign a Planner • Use a Template to create the plan • Have a Process to derive estimates • Have a Process to create the plan, review it and approve it.
Software Project Tracking & Oversight • Use the Plan as chief tool • Regularly track actuals against planned - Status Meetings • Adjust as necessary
Software Project Tracking & Oversight • Assign a Project Manager • Use a Process to track progress • Have a Process to make changes to the Plan
Software Configuration Management* Identify products to CM* Configuration Manage them * Audit their integrity in the CM library
Software Configuration Management* Establish a Change Control Process* Establish a Change Control Board
Software Configuration Management • People to sit on the Change Control Board • A Configuration Manager for the project • A Change Control Process • A Configuration Management Library • A Process to Manage Use of the Library
Software Configuration Management • A Process used to conduct Baseline Audits • A Configuration Management Plan for the project • A Template used to create the CM Plan • A Process used to create, review, and approve the Plan.
Software Quality Assurance* Identify products and activities to audit* Audit them* Report on the Results
Software Quality Assurance * A person appointed to serve as SQA analyst * A Template used to create an SQA Plan for the project. * A Process to follow to create, review, and approve the Plan * A Process used to conduct SQA audits * A Process used to handle noncompliance
Basic Elements of CMM • People in specific roles • Plans • Process to follow the Plans • Measurements
Simplicity:Start small; start easy Grow into the roles Expand when you’re ready
Training:Educate your people at the Start Give your team a common understanding Provide on-going assistanceNot important to be perfect
Consistency:Required for improvementEssential for Team Direction The Key to Software Process Improvement
CMM FlexibilityNot a Series of RulesRecommendations you Implement How You See Fit
CMM Relies on Your Professional Judgment • You know best how your teams work • Configure CMM to work in your way • Understand the ‘intention’ of CMM • Do not read CMM as ‘requirements’
CMM is about Process --Not People • Don’t use CMM to judge performance • Only use CMM to improve process • There is a People-CMM but Cingular is adopting the SW-CMM.