Status of “common crate” project. Events happened after the October meeting. Mail discussion Peter proposed to improve the pin Voltage/Reset/Ground allocation and go to new 5-row connector Richard proposed to use high-current capacity H11 connector
E N D
Events happened after the October meeting • Mail discussion • Peter proposed to improve the pin Voltage/Reset/Ground allocation and go to new 5-row connector • Richard proposed to use high-current capacity H11 connector • Guido Haefeli (Lausanne, EPFL) confirmed that the backplane could be optimised • The proposals were refused because of incompatibility with the TELL1 boards and general agreement that the TELL1 backplane (even not being the best possible) should satisfy our needs VF
J1 POWER CONNECTOR A B C 17 nSysResetnSysResetnSysReset 18 nSysResetnSysResetnSysReset 19 nSysResetnSysResetnSysReset 20 +12V +12V +12V 21 AGND AGNDAGND 22 -12V -12V -12V 23 A5V A5VA5V 24 A5V A5VA5V 25 A5V A5VA5V 26 AGND AGNDAGND 27 AGND AGNDAGND 28 AGND AGNDAGND 29 A-5V A-5V A-5V 30 A-5V A-5V A-5V 31 A-5V A-5V A-5V 32 A-5V A-5V A-5V NA62 specific The AGND of pins 21 should be decoupled from AGND of pins 26-28. J1 POWER CONNECTOR A B C 1 D5V D5VD5V 2 D5V D5VD5V 3 D5V D5VD5V 4 D5V D5VD5V 5 D48V D48VD48V 6 D48V D48VD48V 7 D48V D48VD48V 8 DGND DGNDDGND 9 DGND DGNDDGND 10 DGND DGNDDGND 11 D3V3 D3V3D3V3 12 D3V3 D3V3D3V3 13 D3V3 D3V3D3V3 14 DGND DGNDDGND 15 DGND DGNDDGND 16 DGND DGNDDGND VF
Meeting with WIENER (13.12.10) • Good reception of our specification • The only problem they see is our requirement on the decoupling of the AGND of pins 21 from AGND of pins 26-28(on control side all power supplies have the same ground, the ground difference more than 5V is unacceptable) • The proposal is to foresee on the power supply side of the backplane a solid contact which allow to connect the AGND of pins 21 to AGND of pins 26-28 in case of necessity VF
Next common order of Wiener equipment • Will take place early next year. The deadline for the user request is fixed to January 15 2011. • To be included in this order we have to receive a quotation from WIENER before • If we agree with modified specification, it can be sent immediately • There is a preliminary agreement with the WIENER on rapid quotation • In the best case scenario (we receive the quotation and order the unit before the January 15) the first crate can be delivered in April VF