20 likes | 130 Views
. . . The Fitzsimons Central Utility Plant (CUP) was sized to serve the full campus build-out, but is being equipped ?just in time" as new buildings are being constructed/occupied. This is the CUP's second expansion. This CUP Expansion Project 2 will:Increase the CUP's chilled water production ca
E N D