1 / 9

Case Study: Successful Implementation of a Behavioral Safety Program

Case Study: Successful Implementation of a Behavioral Safety Program. Successful Implementation of a Behavioral Safety Program. The Challenge The Solution Training The Culture Shift The Results The Next Steps. The Challenge. 7 OSHA Recordable Accidents during 2008

lars-kerr
Download Presentation

Case Study: Successful Implementation of a Behavioral Safety Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case Study:Successful Implementation of a Behavioral Safety Program

  2. Successful Implementation of a Behavioral Safety Program • The Challenge • The Solution • Training • The Culture Shift • The Results • The Next Steps

  3. The Challenge • 7 OSHA Recordable Accidents during 2008 • 2.54 TRIR Company-Wide • Contributing Factors: • Business volume doubled 2006 to 2007 then doubled again 2007 to 2008 • Lack of effective infrastructure to support business growth • No true culture of safety

  4. The Solution • The solution is simple…right? • Bring in the right help • Identify/provide proper training • Motivate personnel to actively participate • Create a true culture of safety • Live Happily Ever After…

  5. The Training • Identify appropriate training and personnel to receive that training • REQUIRED TRAINING • Behavioral Safety Training (6 hours) [discuss war stories, effective incident response/reporting/investigation, effective reporting of near miss/first-aid incidents] • Effective Safety Audit Training (2 hours + 1 hour practical) • Safety Leadership Program Training (12 hours) • Effective Case Management Training (2 Hours) • PERSONNEL • VP/Business Unit Leader • General Manager of Operations • Project Manager • General Superintendent • Site Superintendent • Site Foreman

  6. The Culture Shift • This is the single most important element of an effective safety program! • How do you get there? • Shift mindset of personnel to accept responsibility for safe work practices • Lead by example from the top of the organization • Implement/Enforce the Safety Audit Program • Effectively manage the data collected • Provide positive reinforcement to incentivize safe work (reward for proper behavior)

  7. The Results • The results will be evident in many ways! • Improvements in TRIR • Morale/Recruiting • Higher level of near miss/first-aid incidences reported • True Culture of Safety • CAPE Industrial Services TRIR History • 2008: 7 OSHA Recordables; TRIR = 2.54 • 2009: 2 OSHA Recordables; TRIR = 0.63 (Increased total Manhours by 2% over previous year) • 2010: 1 OSHA Recordable; TRIR = 0.30 (Increased total Manhours by 5% over previous year) • 2011: 2 OSHA Recordables; TRIR = 1.30 (Increased total Manhours by 12% over previous year) • 2012: 0 OSHA Recordables YTD (Expecting to increase manhours by 15%+ over 2011)

  8. The Next Steps • What’s next for CAPE’s Safety Program? • Improve positive reinforcement program • Recurring/refresher training program • Improve reporting of near miss/first aid incidences • More effective integration of new craft employees • Proper response to Accidents/Incidents

  9. Case Study:Successful Implementation of a Behavioral Safety Program

More Related