40 likes | 201 Views
Sundry. Higgs unblinding on Friday Very interesting, needs more data… (using only about ½ of data collected so far) Discussion of run extension to take place between experimental spokespersons and CERN directorate on Friday
E N D
Sundry • Higgs unblinding on Friday • Very interesting, needs more data… (using only about ½ of data collected so far) • Discussion of run extension to take place between experimental spokespersons and CERN directorate on Friday • Some discussion has already taken place: some are for and some are against… G. Rakness (UCLA)
Data taken in 2012 This is the full dataset that can be used for the ICHEP conference Note: Last week LHC delivered 1.3/fb. G. Rakness (UCLA)
Downtimes from last week • DAQ power supply failure • Only 4.6/pb lost as the beams were lost • Turbine failure turned off 60 in two stations of CSC • 91/pb affected • ECAL power supply failure • 24/pblost (took longer to diagnose because a [separate] DCS problem was indicating that the crate was ON) • BPXT input card to triggers failed • 5/pb with triggers in a bad state • Temperature sensor failure eventually turned off ECAL cooling • 96/pb with ECAL out My plan: Go over downtimes in 2012 and compare with 2011. My sense is that many of the downtimes this year come from hardware failures. To be confirmed. G. Rakness (UCLA)
To do • Run Coordination • Tomorrow: Finish overhauling shift leader checklist. It’s painful! • https://twiki.cern.ch/twiki/bin/view/CMS/ShiftLeaderInstructionsInProgress • Tomorrow: Help ES+APVe with latency tests • Go over downtimes in 2012 and compare with 2011. My sense is that many downtimes this year come from hardware failures. To be confirmed. • CSC • Put firmware into SVN • Document ALCT/CLCT muonic timing • RAT firmware loading • As well… • Make neutron skims G. Rakness (UCLA)