1 / 16

DINO processes in 2008

DINO processes in 2008. Topics. DINO and DINO Processes? Status 2007 Plans for 2008. DINO. DINO is the geoscientific data and informationcentre of The Netherlands and forms the very heart of the Geological Survey of the Netherlands Comprises two teams: Data Management & ICT

larue
Download Presentation

DINO processes in 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DINO processes in 2008 User committee DINO DO September 19th 2007

  2. Topics • DINO and DINO Processes? • Status 2007 • Plans for 2008 User committee DINO DO September 19th 2007

  3. DINO • DINO is the geoscientific data and informationcentre of The Netherlands and forms the very heart of the Geological Survey of the Netherlands • Comprises two teams: Data Management & ICT • As a department since July 1st, 2004 User committee DINO DO September 19th 2007

  4. Data Management • Aim to evolve into a process organisation • ideally: routine, standardised, generalistic, continuous, efficiency • in practice a mix of processes and projects • Dataflow oriented • Datatype oriented • Database oriented User committee DINO DO September 19th 2007

  5. File Collect Supply Quality Control Dataflow and DINO process Soil and groundwaterdata Shallow subsurface E&P and miningdata Process User committee DINO DO September 19th 2007

  6. No processes without DINO ICT • Datamanagement needs systems • ICT develops and maintains the systems • All systems are developed in-house • Modular • Continuously changing, e.g. • new modules • new datatypes • new relations between modules • Close co-operation between Data Management and ICT User committee DINO DO September 19th 2007

  7. Goals and prerequisitesE&P and miningdata • Focus coming years • E • to make the public borehole data available • basic borehole data and log data • Prerequisites • database modules operational • content complete and reliable • easy access via NLOG • confidentiality secured • historical (non digital) data has to be regarded • efficient processing of new data User committee DINO DO September 19th 2007

  8. SMC RES RES BRH BRH DINO ModulesE&P Mining (1) Sep 2007 ultimo2007 • DINO-SMC • seismic surveys 3D • seismic surveys 2D • DINO-RES • production data • production wells • accumulations and fields • reserves (conf) • DINO-BRH • boreholes, drilling progress • directional surveys, stratigraphy • core analysis User committee DINO DO September 19th 2007

  9. BHM BHM LCS AST LCS DINO ModulesE&P Mining (2) Sep 2007 ultimo2007 • DINO-LCS • licences • DINO-AST • contents E&P archive • logs • documents • cd’s, dvd’s • DINO-BHM • digital logdata (LIS-LAS) User committee DINO DO September 19th 2007

  10. SMP QUA SMP DINO ModulesE&P Mining (3) Sep 2007 ultimo2007 • DINO-SMP • sample repository • cuttings • cores • DINO-QUA • geochemistry • vitrinite reflectance • Rock-Eval • GC-analyses • (gas composition) User committee DINO DO September 19th 2007

  11. Processes in 2008overall goals • streamlining the incoming dataflow • all data Art 123 Mining Act • digital data only • standardised formats • facilitate upload of data working groups DINO Atrium User committee DINO DO September 19th 2007

  12. BRH BRH BRH BRH borehole data in 2008 • Improving the content of the database by completing the comparison between DINO and operators • basic data • directional surveys • core analysis • adding new content • temperature and pressure data (historical data) User committee DINO DO September 19th 2007

  13. AST logs and documents in 2008 • Logscan projectScanning the logs stored in the TNO E&P archive and making them available at NLOG • start with paper logs (logistics) • start with the northern offshore (exploration potential) • pilot in 2007 for 10.000 logs (optimistic) • We need and seek the help of operators to supply us with logs scanned already • Wintershall has set a fine example • TNO will visit operators to ascertain their willingness • sufficient logistic problems remain to be resolved by DINO in 2008 User committee DINO DO September 19th 2007

  14. BHM BHM BHM digital logdata in 2008 • From to • making the content available • unzipping borehole seismics • export in LAS • extraction of temperature-data User committee DINO DO September 19th 2007

  15. SMP QUA SMP SMP QUA SMP sample repository geochemical results sample repository and sample analyses in 2008 • From to • database comparison TNO-operators • filling the gap • adding new content • gas composition data (samples) • biostratigraphic slides (analysis) User committee DINO DO September 19th 2007

  16. Questions? User committee DINO DO September 19th 2007

More Related