An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHMSA PerspectivesConstruction Process & Standards API – AGA Joint Committee Oil & Gas Pipeline Welding Practices New Orleans, LA Steve Nanney January 27, 2010

  2. Overview • Regulatory Overview of 2009/2010 • PHMSA Expectations • PHMSA Actions to Date • API 5L Actions to Date • Construction Issues - Summary • API – Needed Actions • Challenges • Looking Ahead • PHMSA Links

  3. Regulatory Overview of 2009/2010 • Editorial Rule – Published 11/30/09 • Distribution IMP – Published 12/4/09 • Control Room Management – Published 12/7/09 • One Rule - Summer 2010 • Standards Update - Summer 2010 • Miscellaneous Rule – Summer 2010 • Excavation Damage – To Be Determined (TBD) • Low Stress Integrated Insp. – TBD

  4. PHMSA Expectations • Hold safety paramount • Protect the public and environment • Follow the regulations • Update standards - reflective of issues • Focus on people and processes • Quality Management Systems

  5. PHMSA Actions to Date April 23, 2009: PHMSA New Construction Workshop May 14, 2009: ADB: Potential Low and Variable Yield and Tensile Strength& Chemical Composition Properties in High Strength Line Pipe June 5, 2009: PHMSA Letter to Industry Trade Associations June 22, 2009: API Standards Conference Summer 2009: Letters to Alternative MAOP SP holders on Low Strength Pipe Spring/Fall 2009: Worked with Operators to identify low strength pipe & remove August 2009: Construction web site established November 2009: Weld in service rupture due to alignment and welding January 2010: Weld in service leak due to alignment and welding

  6. API 5L - Actions to Date • API 5L – sub-committee proposed changes for “low strength” pipe issues • QA management system for the supplying steel and rolling mill (8.3.1) • Coil/plate rolling practice shall be controlled to ensure mechanical properties are uniform (8.3.7) • Qualifications in hot rolling practice deviations (8.3.8) • Standard sampling locations along plate or coil length according to documented procedures (10.2.3.2) • Modifications to retest procedures (10.2.12.2)

  7. API 5L Actions to Date - continued • Manufacturing Procedure Specification – new (B.3) • Inspection and Test Plan – required (B.4) • Manufacturing Procedure Qualification Tests – mechanical tests (B.5.3) • Qualification consider assessment of coil/plate tensile property variability and coil/plate to pipe strength changes • Purchaser shall be notified of all plate/coil/pipe that do not meet the initial defined rolling practices control parameters, but have been re-qualified (B5.6 and B5.7)

  8. API Actions to Date • API 5L – subcommittee – co-chairs and members • Great effort to improve API 5L standards • API 5L – sub-committee proposed changes for “low strength” pipe • Needs API Membership approvals • PHMSA is appreciative of Efforts • “Proposed” Revisions to API 5L need timely approvals

  9. Construction Issues - Summary

  10. Construction Issues • Low Strength Pipe • Coating Adhesion

  11. Construction Issues • Repair Weld Cracking Issues

  12. Construction Issues • Pipe bevel ends and alignment – high/low

  13. Construction Issues • Welding, NDT, Transitions, & Alignment • Cut Induction Bends

  14. Construction Issues • Alignment – does it meet standards for API 1104?

  15. Construction Issues • Alignment – does it meet standards for API 1104?

  16. Construction Issues • Weld Failures – Transition and Cracking • Pipe Sizes • 42-inch • 36-inch • 30-inch • 20-inch

  17. API 1104 – Needed Actions • Appendix A – Guidance for ECA • Input Parameters for ECA • Defined steps in defining Defect Acceptance Criteria • Pipeline stress analysis – using field construction and operational extremes for procedures • WPQ – Essential Variables • Defect Acceptance Criteria • UT – verification procedures • Procedures – for field usage • Training

  18. Joint API – Needed Actions • Appendix A - Weld Procedure – Essential Variables • Change in the grade or manufacturing process of the pipe material or a change in the chemical composition or processing – • Different- steel manufacturers and hot rolling practices • Major change in joint design – (API 1104 & API 5L) • Pipe Bevel Alignment – usage of API 5L and/or ASME B31.8 or 31.4 criteria - (API 1104 & API 5L)

  19. Joint API – Needed Actions • Weld Tolerances – (API 1104 and API 5L) • Pipe, diameter of body and pipe ends - API 5L • Bevel Design – API 1104 & ASME B31.8 and B31.4 • Alignment – API 1104 • Varying/uneven wall thickness (ASME B31.4 and B31.8) • Bends – cut within bend – ovality/out-of-roundness criteria • Repair welding – (API 1104) • Preheat • Welding procedures • Post heat • NDT standards

  20. Transition Weld Failures • Alignment – bevel and uneven wall thickness • Ovality and out-of-roundness • Lateral displacement during construction • Soil settlement • Overburden loads • Pipeline right-of-way topography • Weld stress concentration factor (SCF) • Internal pressure

  21. Transition Weld Failures • Alignment – does it meet standards for API 1104?

  22. Challenges • Industry • Putting safety first – in practice • Establishing standards that address all issues • Recognize that large diameter, higher grade material with higher operating pressures need “updated and some new” practices • People • Getting people to consistently do it right • Finding and retaining appropriate skill sets • Achieving sustained improvements • Processes • Establishing proper procedures • Ensuring a seamless transition between contractors and owners • Contracting methods

  23. Looking Ahead • PHMSA construction inspection focus will continue • Expect increased use of enforcement actions on all construction issues – 72%SMYS and 80%SMYS • MAOP Rule • Construction OQ – required by MAOP Rule • (If planning project, contact PHMSA Region for details.) • May need to explore other options: • More effective regulations and standards • Timely enforcement actions • Operator qualification for construction

  24. PHMSA – links • Pipeline Safety Guidance – Advisory Bulletins, Low Strength Pipe Guidelines, MAOP Rule FAQs • http://www.phmsa.dot.gov/pipeline/guidance • Construction Workshop • http://primis.phmsa.dot.gov/construction/index.htm • MAOP Rule – FAQs • http://primis.phmsa.dot.gov/maop/index.htm • Special Permits – FAQs • http://primis.phmsa.dot.gov/classloc/faqs.htm

  25. QUESTIONS

  26. Thank you Steve Nanney Office: 713-272-2855 Mob: 713-628-7479 E-mail: steve.nanney@dot.gov